Compliance Verification Activity Report: CV2223-260 - Enbridge Pipelines Inc.

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2223-260
Start date: 2022-07-18
End date: 2022-07-21

Team:

Regulated company: Enbridge Pipelines Inc.

Operating company: Enbridge Pipelines Inc.

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

Field inspection in support of the Management System Audit of contaminated sites management. Locations across the Enbridge right of way and facilities in western/central Manitoba were inspected, with a contaminated sites management focus in the general theme of Environmental Protection.

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Observations (no outstanding follow-up required)

Observation 1 - General Observation

Date & time of visit: 2022-07-19 10:15

Discipline: Environmental Protection

Categories:

Facility:

Observations:

The Inspection Team verified compliance at various locations in Manitoba as desribed below:

Cromer Terminal

Souris River RoW Crossing
MP620 - Oak Lake
Contaminated Site Facility Monitoring - Stations
The inspection Team viewed the West Souris Station, (REM-0255) the Manitou Station (REM-0111) and the St. Leon Station (REM-0359) to verify compliance with Enbridge’s operational documents as well as the Facility Groundwater Monitoring Program.
Black Creek (REM-0103)
The group had an interesting discussion about risk management and risk assessment as related to Black Creek specifically, and also in general, to share information about management of contaminated sites.

Compliance tool used: No compliance tool used

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program