Compliance verification activity type: Field Inspection
Team:
Regulated company: Trans Mountain Pipeline ULC
Operating company: Trans Mountain Pipeline ULC
Province(s) / Territory(s):
Discipline(s):
Rationale and scope:
TMEP Inspection of Spread 4B and pump stations - Observation of work associated with pipe and components on the pipeline or pump stations, such as transportation, loading and unloading, stringing, bending, alignment, welding, lowering-in, and backfill. In addition, observations of geohazards sites and geohazards mitigation measures, trenchless installation, water crossings and buoyancy control measures applied, and foundation installation related to infrastructure required for the project operation.
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Observation 1 - TM Pipe suspension Location (SF58)
Date & time of visit: 2022-07-11 13:00
Discipline: Integrity Management
Categories:
Facility:
Observations:
Compliance tool used: No compliance tool used
Observation 2 - Trench box location
Observation 3 - Pipe Relocation and Lowering
Observation 4 - Welding location
Observation 5 - Clearwater River DPI Entry point
Date & time of visit: 2022-07-12 08:30
Observation 6 - Clearwater River DPI Exit point
Date & time of visit: 2022-07-12 10:00
Observation 7 - HDD under the Town of Clearwater entry point
Date & time of visit: 2022-07-12 13:00
Observation 8 - SF 57 - North of Clearwater - welding
Date & time of visit: 2022-07-12 14:00
Observation 9 - SF 57 - South of Clearwater
Observation 10 - Blackpool slope
Date & time of visit: 2022-07-12 15:00
Observation 11 - Blackpool pump station
Date & time of visit: 2022-07-13 09:00
Observation 12 - Boring location
Date & time of visit: 2022-07-13 15:00
Compliance tool used: Corrected Non-compliance (CNC)
Regulatory requirement:
Relevant section(s):
Company action required:
Company shall demonstrate that no persons enter unsafe excavation until a trench box is installed in the ditch/trench, refrain from accessing the ditch/trench until it is properly protected from failure and provide photo evidence that no person entered the ditch/trench
Due date: 2022-07-13
Date closed: 2022-07-26 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Reason closed: Requirement met
Compliance achieved: Yes
Observation 13 - Backfilling and Pipe lifting
Date & time of visit: 2022-07-13 16:00
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program