Compliance verification activity type: Field Inspection
Team:
Regulated company: Minell Pipeline Limited
Operating company: Manitoba Hydro
Province(s) / Territory(s):
Discipline(s):
Related events:
Rationale and scope:
Emergency response activity related to incident INC2021-147, a rupture of the Minell pipeline near Moosomin, SK. This activity does not include additional compliance verification activities not related to the Emergency Phase of the incident.
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Observation 1 - Emergency Response Activities
Date & time of visit: 2022-01-18 16:30
Discipline: Emergency Management
Categories:
Facility:
Observations:
The CER EM Inspection Officer (IO) oversaw Manitoba Hydro's (MH) emergency response activities at the incident site NE of Moosomin, SK, just east of the SK/MB border, and at the Emergency Operations Centre in Russel, MB. Incident Site
Emergency Operations Centre (EOC)
Compliance tool used: No compliance tool used
Observation 2 - IR 1 - Cutting - Personal Protective Equipment
Discipline: Safety Management
CER Inspection Officer (IO) observed company workers cutting pipe with a handheld angle grinder and cut off disk. The worker wore eye protection but no face shield. Upon inquiry, company safety representative confirmed that no face protection was required for the task.
Compliance tool used: Information Request (IR)
Regulatory requirement:
Relevant section(s):
Company action required:
Due date: 2022-02-05
Date closed: 2022-02-15 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Reason closed: Requirement met
Compliance achieved: Yes
Observation 3 - IR 2 - Cutting - Wheel Guards
CER Inspection Officer observed a portable angle grinder fitted with a cut-off disc. The wheel guard appeared to be Type 27 & 28, and did not cover a full 180° area on all sides of the wheel. Note - the grinder was not in use at the time of observation.
Due date: 2022-02-15
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program