Compliance Verification Activity Report: CV2223-198 - PKM Cochin ULC

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2223-198
Start date: 2022-09-06
End date: 2022-09-08

Team:

Regulated company: PKM Cochin ULC

Operating company: Pembina Pipeline Corporation

Province(s) / Territory(s):

Discipline(s):

Rationale and scope:

Inspection to verify company procedures in place for 2nd or 3rd party oversight

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Observations (no outstanding follow-up required)

Observation 1 - Damage Prevention Contractor Oversight Field Inspection

Date & time of visit: 2022-09-07 07:00

Discipline: Damage Prevention

Categories:

Facility:

Observations:

Canada Energy Regulator (CER) Inspection Officers (IO) met with Pembina Pipelines who operates the PKM Cochin ULC Pipeline to conduct a Damage Prevention Contractor Oversight Field Inspection, project description 7241 Construction of Pipeline from NE 2-17-21 W2M to NE 23-17-21 W2M on PKM Cochin ULC (PKM) located near Regina, SK. on Sept 6/7, 2022.
Opening Meeting, Sept 6/22:

Field inspection, Sept 7/22:
Contractor Oversight

CER IOs attended third-party contractor tail gate meeting. Topics discussed but not limited to below:

ROW conditions Damage Prevention Program Close Out meeting, Sept 7/22:

Compliance tool used: No compliance tool used

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program