Compliance verification activity type: Field Inspection
Team:
Regulated company: PKM Cochin ULC
Operating company: Pembina Pipeline Corporation
Province(s) / Territory(s):
Discipline(s):
Rationale and scope:
Inspection to verify company procedures in place for 2nd or 3rd party oversight
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Observation 1 - Damage Prevention Contractor Oversight Field Inspection
Date & time of visit: 2022-09-07 07:00
Discipline: Damage Prevention
Categories:
Facility:
Observations:
Canada Energy Regulator (CER) Inspection Officers (IO) met with Pembina Pipelines who operates the PKM Cochin ULC Pipeline to conduct a Damage Prevention Contractor Oversight Field Inspection, project description 7241 Construction of Pipeline from NE 2-17-21 W2M to NE 23-17-21 W2M on PKM Cochin ULC (PKM) located near Regina, SK. on Sept 6/7, 2022. Opening Meeting, Sept 6/22:
Compliance tool used: No compliance tool used
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program