Compliance Verification Activity Report: CV2223-102 - Trans Mountain Pipeline ULC

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2223-102
Start date: 2022-05-30
End date: 2022-06-01

Team:

Regulated company: Trans Mountain Pipeline ULC

Operating company: Kinder Morgan Canada Inc

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

Inspection of TMEP Spread 5B construction activities including pipe storage, transportation, stinging, pipe handling, welding, tie-ins, and HDD

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Observations (no outstanding follow-up required)

Observation 1 - Day 1 (Laidlaw pipe yard)

Date & time of visit: 2022-05-30 08:00

Discipline: Integrity Management

Categories:

Facility:

Observations:

Popkum Yard Field Office

Safety orientation:
Received an approximate 30-minute safety orientation. Discussion included:

Opening meeting: 
Laidlaw pipe yard: Action items:
  1. Provide the pipe cleaning procedure, evaluation, acceptance criteria, and mitigation procedure. COMPLETE 3 June 2022
  2. Provide the presentation that was given to CER inspectors at the Laidlaw yard.  COMPLETE Presentation provided 9 June 2022

Compliance tool used: No compliance tool used

Observation 2 - Day 2 (KP1048 Tie-in welding, Bonatti Sagit Pipe Yard, Mainline Automatic welding)

Date & time of visit: 2022-05-31 07:30

Discipline: Integrity Management

Categories:

Facility:

Observations:

Popkum Yard
Attended and observed the Macro welding crew Tailgate meeting.
Meeting discussed the following:

Morning meeting with TMEP at Popkum Yard Field Office KP1048 Tie-in welding Bonatti Sagit Pipe Yard: Mainline Automatic welding Action items:
  1. The "Controlled Welding" designation process which includes criteria to impose, conduct a root cause analysis, and mitigation and acceptance criteria for removal of the "Controlled Welding" designation
  2. Welding inspectors' reports for the day that the "Controlled Welding" was issued on the Kiewit/Bonatti spread mainline mechanized welding.
  3. Welding inspector and NDE reports for 31 May 2022 for all mainline welding (e.g., mechanized mainline, tie-in).
  4. The NDE acceptance criteria used on Spread 5B.
    1. Confirmation that the weld acceptance criteria are solely based on CSA Z662-19 Clause 7.0 and the values can be referenced from Clause 7.0.

Compliance tool used: No compliance tool used

Observation 3 - Day 3

Date & time of visit: 2022-06-01 08:30

Discipline: Integrity Management

Categories:

Facility:

Observations:

Morning briefing


Inspection Action Items
  1. For welds that have been repaired more than once, provide the weld inspection and NDE report (three of them) and the criteria used to guide when more than one repair is allowed.
  2. Indicate the number of "Controlled Welding" conditions on other spreads and how to assure consistency in imposition, analysis, and removal.
  3. Related to weld parameter measurements and specifically how the IR drop is considered during the measurement of field weld parameters to verify compliance with the WPS:
    1. Provide any procedure and or criteria used for IR drop measurement among the various weld inspectors 
    2. Is this procedure used on all TMEP spreads?
    3. Highlight if there is a requirement to record whether IR drop is considered during the weld parameter measurements and in the heat input calculations
  4. Provide the side boom counterweight removal procedure. 

Compliance tool used: No compliance tool used

Observation 4 - IR 1 (Laidlaw pipe yard)

Date & time of visit: 2022-06-06 13:00

Discipline: Integrity Management

Categories:

Facility:

Observations:

See 2022-06-07 11:42 Draft Action items from 06 June 2022 meeting for IR
See CV2223-102 IR1 due June 7, 2022 and 2022-06-04 12:41 APPROVED - PTL Consolidated Guidelines for Procedures on Flood Material Recovery and Reclamation - R0 (05-25-2022) for responses.

Compliance tool used: No compliance tool used

Observation 5 - IR 2 (Daily Action Items)

Date & time of visit: 2022-06-07 13:00

Discipline: Integrity Management

Categories:

Facility:

Observations:

This IR provides a summary of the responses to the daily inspection observation action items.
See CV2223-102 Inspection Action Items for the IR
See the attached PDFs for the responses that were outstanding from the daily action items.

Compliance tool used: No compliance tool used

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program