Compliance verification activity type: Field Inspection
Team:
Regulated company: NOVA Gas Transmission Ltd.
Operating company: TransCanada PipeLines Limited
Province(s) / Territory(s):
Discipline(s):
Rationale and scope:
Construction inspection for the NGTL West Path Delivery Project to construct and operate approximately 21.5km NPS42 pipeline near Cochrane. Project includes 2 compressor stations and 2 HDDs (Bow River and the proposed Springbank Off-Stream Reservoir)
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Regulatory instrument number(s):
Observation 1 - 25 October 2019 - Observations
Date & time of visit: 2019-10-25 09:00
Discipline: Integrity Management
Categories:
Facility:
Observations:
Documentation Review (Field Office):
Compliance tool used: No compliance tool used
Observation 2 - 5 November 2019 - Observations
Date & time of visit: 2019-11-05 09:00
UT Review (Field Office):
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program