Compliance Verification Activity Report: CV1920-045 - Enbridge Pipelines Inc.

Overview

Compliance verification activity type: Field Inspection

Activity #: CV1920-045
Start date: 2019-07-15
End date: 2019-07-19

Team:

Regulated company: Enbridge Pipelines Inc.

Operating company: Enbridge Pipelines Inc.

Province(s) / Territory(s):

Discipline(s):

Rationale and scope:

Final Clean Up Inspection of Spread 2 of the Enbridge Line 3 Replacement Program. Construction was completed in 2018 with only final clean up remaining. Inspection focused on soil handling practices and watercourse crossing. This inspection was co-conducted with Indigenous Monitors (IMs) from the Indigenous Monitoring and Advisory Committee (IAMC).

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Regulatory instrument number(s):

Observations (no outstanding follow-up required)

Observation 1 - General Observations

Date & time of visit: 2019-07-18 12:00

Discipline: Environmental Protection

Categories:

Facility:

Observations:

 General Observations

Construction YardEagle Creek KP 222Bird Biologist
The inspection team met with a biologist conducting the nest surveys on spread 2. The following information was provided:Progress PastureNo compliance concerns were identified during this inspection and no follow-up is required at this time. Reports from the Indigenous Monitors will be available through the website for the Line 3 IAMC.
 

Compliance tool used: No compliance tool used

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program