Compliance Verification Activity Report: CV1718-399 - Enbridge Pipelines Inc.

Overview

Compliance verification activity type: Field Inspection

Activity #: CV1718-399
Start date: 2018-03-26
End date: 2018-03-26

Team:

Regulated company: Enbridge Pipelines Inc.

Operating company: Enbridge Pipelines Inc.

Province(s) / Territory(s):

Discipline(s):

Rationale and scope:

Construction Inspection L3RP (OC-63 & AO-1-XO-E101-004-2016) facilities - Hardisty Tank Construction. Looking at construction, welding, and inspection practices.

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Regulatory instrument number(s):

Observations (no outstanding follow-up required)

Observation 1 - Construction Office Documentation Review

Date & time of visit: 2018-03-26 12:30

Discipline: Integrity Management

Categories:

Facility:

Observations:

Compliance tool used: No compliance tool used

Observation 2 - Tank Construction Inspection

Date & time of visit: 2018-03-26 13:15

Discipline: Integrity Management

Categories:

Facility:

Observations:

Compliance tool used: No compliance tool used

Observation 3 - Additional Document Review

Date & time of visit: 2018-03-26 14:45

Discipline: Integrity Management

Categories:

Facility:

Observations:

Returned to Meeting trailer and reviewed the current CGSB qualification ticket expiration date for the NDE inspector that was noted to have an expired ticket earlier.

Compliance tool used: No compliance tool used

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program