Compliance Verification Activity Report: CV2122-379 - Enbridge Pipelines Inc.

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2122-379
Start date: 2022-02-15
End date: 2022-02-15

Team:

Regulated company: Enbridge Pipelines Inc.

Operating company: Enbridge Pipelines Inc.

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

Field inspection of the response to INC2022-029 release of crude oil within the Edmonton Terminal.

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Observations (no outstanding follow-up required)

Observation 1 - General Observation - Spill Response

Date & time of visit: 2022-02-15 13:00

Discipline: Environmental Protection

Categories:

Facility:

Observations:

Environmental Protection Inspection Officers (IOs) inspected Enbridge's response to the crude oil release which occurred on the evening of 12 February 2022 at the Edmonton Terminal. IOs assessed Enbridge's general response to the clean-up, with focus on management and monitoring of the hazard that the crude oil poses to environmental and human health. Specific observations noted during the inspection are as follows:

Clean-up Approach

Air Quality Monitoring

Signage

Personal Protective Equipment

 

Compliance tool used: No compliance tool used

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program