Compliance Verification Activity Report: CV2223-088 - Trans Mountain Pipeline ULC

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2223-088
Start date: 2022-06-28
End date: 2022-06-29

Team:

Regulated company: Trans Mountain Pipeline ULC

Operating company: Kinder Morgan Canada Inc

Province(s) / Territory(s):

Discipline(s):

Rationale and scope:

TMX Spread 5A - Assess field implementation of construction safety manual and project specific safety plans for ongoing construction activities; worker tasks including identification of hazards and appropriate controls relevant to the job tasks via hazard assessments; company implementation of infection prevention protocols; company oversight of contractors - training & competence, monitoring, supervision and accountability; assess execution of work per applicable procedures and documented work practices. Verify/assess implementation of noise and traffic management plans - Conditions 73.
 

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Information Request

IR from CER (Information Request sent from CER to company)
NNC -1 Corrective Action Question

Legislative Requirement : Canadian Energy Regulator Act (CERA)

Sections of the Act

  • Canadian Energy Regulator Act (CERA)
    • Administration and Enforcement
      • Duty to assist<br />103 (4) The owner or person in charge of the place and every person in the place must give all assistance that is reasonably required to enable the inspection officer to perform their duties and functions under this section and must provide any documents or information, and access to any data, that are reasonably required for that purpose.

Theme and Categories

Safety Management
  • Equipment, Tools, Machinery
    • Use, Operation, Repair and Maintenance of Tools and Machinery
    • Use, Operation, Repair and Maintenance of Mechanical & Critical Lifting Equipment
  • Management of Change
    • Management of Change

Due Date : 2022-09-02

Review Response
Acceptable

Follow-up Action
None

Observations (no outstanding follow-up required)

Observation 1 - General Observation

Date & time of visit: 2022-06-29 18:15

Discipline: Safety Management

Categories:

Facility:

Observations:

Compliance tool used: No compliance tool used

Observation 2 - Canada Labour Code

Date & time of visit: 2022-06-28 06:50

Discipline: Safety Management

Categories:

Facility:

Observations:

ODH confirmed with TMEP Safety Lead that that TMEP - Spread 5A has had zero COVID cases for the month of June 2022.
Official Delegate of the Head of Compliance and Enforcement (ODH) provided an overview of the Canada Labour Code (CLC) Part II and explained ODH authorities and CLC tools available to enforce compliance (i.e. Assurance of Voluntary Compliance, Issuing of Directions and Stop Work/Danger Notice).

ODH discussed Mental Fatigue at opening meeting with TMEP attendees, and that with the Hot Weather being forecasted prior to the July long-weekend for TMEP management to be aware of and to take appropriate action such as frequent short breaks and to have water readily available so the workers do not become dehydrated, and to control/mitigate issues that may arise for the field workers.
WorkPlace Violence and Harassment Regulations came into effect January 1, 2022 requiring employers that they "must have" a WorkPlace Violence and Harassment Program in place and working for all workers to be able to access. ODH provided Clearview Connects, Secure and Anonymous Reporting number to submit a report.


 

Compliance tool used: No compliance tool used

Observation 3 - CNC - 1 Unattended Mobile Equipment

Date & time of visit: 2022-06-29 09:00

Discipline: Safety Management

Categories:

Facility:

Observations:

CER Inspection Officers observed three (3) Rock Trucks parked downwards on a slopped terrain without the tires being chocked. Worksafe BC, OHS regulations, 16.9 Unattended mobile equipment, (1) An operator of mobile equipment must not leave the controls unattended unless the mobile equipment has been secured against inadvertent movement by
(a) engaging at least 2 effective braking or parking systems or devices
(iii) chocks for the wheels

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Company shall chock front tires of the (3) rock trucks parked downwards on the sloped terrain.

Due date: 2022-06-29

Date closed: 2022-06-29
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 4 - NNC -1 - Lifting, Hoisting, Rigging and "below the hook" devices

Date & time of visit: 2022-06-29 12:00

Discipline: Safety Management

Categories:

Facility:

Observations:

NNC - 1 - Materials Baskets - HDD Site kp987 +100m

CER Inspection Officer (IO) observed multiple non-compliances with regard to lifting and hoisting equipment, rigging, and below the hook devices; 

Compliance tool used: Notice of Non-compliance (NNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Trans Mountain Expansion Project is to assure a targeted inspection of Direct Horizontal Drilling work locations in completed, specific to and inclusive of lifting practices, lift plans, hoisting, rigging and below the hook devices. Additionally noting:

Due date: 2022-08-26

Date closed: 2022-09-12
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 5 - CNC - 2 - Working at Height and Self-Retracting Lifeline

Date & time of visit: 2022-06-28 10:00

Discipline: Safety Management

Categories:

Facility:

Observations:

CNC - 2 - Self-Retracting Lifeline (SRL) 

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

  1. Remove from the work site, any self-retracting lifelines that are not accompanied by a record of the initial In-Service dates, and any accompanying and required re-certification Inspection records
  2. Inspect all Bothar work locations where personnel man-baskets are in use, and complete a targeted inspection of the Control Measures for Man-Basket Use, as identified in the Bothar PSSP. 

Due date: 2022-07-01

Date closed: 2022-07-01
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program