Compliance verification activity type: Field Inspection
Team:
Regulated company: Trans Mountain Pipeline ULC
Operating company: Kinder Morgan Canada Inc
Province(s) / Territory(s):
Discipline(s):
Rationale and scope:
TMX Spread 5A - Assess field implementation of construction safety manual and project specific safety plans for ongoing construction activities; worker tasks including identification of hazards and appropriate controls relevant to the job tasks via hazard assessments; company implementation of infection prevention protocols; company oversight of contractors - training & competence, monitoring, supervision and accountability; assess execution of work per applicable procedures and documented work practices. <span style="font-size:11pt"><span style="font-family:Calibri,sans-serif">Verify/assess implementation of noise and traffic management plans - Conditions 73.</span></span><br />
Compliance tool(s) used:
Facilities:
Facility Types
Regulatory requirements that apply to this activity:
Observation 1 - General Observation
Date & time of visit: 2022-06-29 18:15
Discipline: Safety Management
Categories:
Facility:
Observations:
Compliance tool used: No compliance tool used
Observation 2 - Canada Labour Code
Date & time of visit: 2022-06-28 06:50
ODH confirmed with TMEP Safety Lead that that TMEP - Spread 5A has had zero COVID cases for the month of June 2022. Official Delegate of the Head of Compliance and Enforcement (ODH) provided an overview of the Canada Labour Code (CLC) Part II and explained ODH authorities and CLC tools available to enforce compliance (i.e. Assurance of Voluntary Compliance, Issuing of Directions and Stop Work/Danger Notice). ODH discussed Mental Fatigue at opening meeting with TMEP attendees, and that with the Hot Weather being forecasted prior to the July long-weekend for TMEP management to be aware of and to take appropriate action such as frequent short breaks and to have water readily available so the workers do not become dehydrated, and to control/mitigate issues that may arise for the field workers. WorkPlace Violence and Harassment Regulations came into effect January 1, 2022 requiring employers that they "must have" a WorkPlace Violence and Harassment Program in place and working for all workers to be able to access. ODH provided Clearview Connects, Secure and Anonymous Reporting number to submit a report.
Observation 3 - CNC - 1 Unattended Mobile Equipment
Date & time of visit: 2022-06-29 09:00
CER Inspection Officers observed three (3) Rock Trucks parked downwards on a slopped terrain without the tires being chocked. Worksafe BC, OHS regulations, 16.9 Unattended mobile equipment, (1) An operator of mobile equipment must not leave the controls unattended unless the mobile equipment has been secured against inadvertent movement by (a) engaging at least 2 effective braking or parking systems or devices (iii) chocks for the wheels
Compliance tool used: Corrected Non-compliance (CNC)
Regulatory requirement:
Relevant section(s):
Company action required:
Company shall chock front tires of the (3) rock trucks parked downwards on the sloped terrain.
Due date: 2022-06-29
Date closed: 2022-06-29 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Reason closed: Requirement met
Compliance achieved: Yes
Observation 4 - NNC -1 - Lifting, Hoisting, Rigging and "below the hook" devices
Date & time of visit: 2022-06-29 12:00
NNC - 1 - Materials Baskets - HDD Site kp987 +100m CER Inspection Officer (IO) observed multiple non-compliances with regard to lifting and hoisting equipment, rigging, and below the hook devices;
Compliance tool used: Notice of Non-compliance (NNC)
Trans Mountain Expansion Project is to assure a targeted inspection of Direct Horizontal Drilling work locations in completed, specific to and inclusive of lifting practices, lift plans, hoisting, rigging and below the hook devices. Additionally noting:
Due date: 2022-08-26
Date closed: 2022-09-12 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Observation 5 - CNC - 2 - Working at Height and Self-Retracting Lifeline
Date & time of visit: 2022-06-28 10:00
CNC - 2 - Self-Retracting Lifeline (SRL)
Due date: 2022-07-01
Date closed: 2022-07-01 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program