Compliance Verification Activity Report: CV2122-116 - Trans Mountain Pipeline ULC

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2122-116
Start date: 2021-10-18
End date: 2021-10-22

Team:

Regulated company: Trans Mountain Pipeline ULC

Operating company: Kinder Morgan Canada Inc

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

Environmental inspection of spread 5B construction focusing on implementation of mitigation measures committed to in the EPP, Resource Specific Mitigation Tables, the SARA Permit and specific contingency plans. Spread 5B consists of new pipeline construction and installation of a 36 NPS pipeline, and the Spread starts at the Coquihalla Summit at KP 990.30 and ends at KP 1075.92. Areas of focus during the inspection included Heritage Resources, SARA listed species, watercourses and sediment and erosion control.

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Observations (no outstanding follow-up required)

Observation 1 - General Observations

Date & time of visit: 2021-10-28 15:00

Discipline: Environmental Protection

Categories:

Facility:

Observations:

KP 987+350KP 993+850 
KP 995+220KP 1000+300KP 1054+300
KP 1056+800KP 1057+180KP 1062+680 
 

Compliance tool used: No compliance tool used

Observation 2 - Watercourses and Wetlands

Date & time of visit: 2021-10-20 16:00

Discipline: Environmental Protection

Categories:

Facility:

Observations:


Watercourse and wetland location observed during the inspection include:
KP 988+070 Wetland WT-1132 and KP 988+930 BC-582a

KP 991.09 BC-584 Unnamed Channel

KP 989+540 WT-390aKP 994+250 BC-588 Fallslake Creek (Fish bearing)KP 994+180 BC-587c

KP 994+120 BC-587b NCD
 
KP 1000+380 BC-591 Boston Bar Creek

KP 1030+150 Coquihalla River BC-645 (Fish bearing)KP 1021+510 BC-633a Unnamed Channel (Fish bearing), and KP 1021+560 BC-633b Unnamed Channel (Fish bearing) KP 1021+790 BC-634 Karen Creek (Fish bearing)KP 1053+190 BC-662 Hunter Creek (Fish bearing)KP 1062+330 BC-672 Unnamed ChannelKP 1063+270 BC-676 Unnamed Channel

Compliance tool used: No compliance tool used

Observation 3 - CNC #1

Date & time of visit: 2021-10-28 14:45

Discipline: Environmental Protection

Categories:

Facility:

Observations:

At KP 1063.04, a small amount of sediment laden water was flowing across the RoW extending past the project boundaries. Erosion and sediment controls were installed however the staked straw wattles were overwhelmed by water. One straw wattle was washed over the bank.

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

1. Provide evidence as to whether ESC measures were fixed as previously identified on TMEP's deficiency list.
2. Complete ESC repairs as needed to mitigate inadequate ESC measures presently installed. Provide photographic evidence that these repairs have been completed.

Due date: 2021-10-29

Date closed: 2021-11-05
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 4 - IR #1 Heritage Resources Contingency Plan

Discipline: Socio-Economic

Categories:

Facility:

Observations:

The CER Inspection team was informed that a potential heritage resource was discovered at the Coquihalla River at KP 1030+150 on 8 September 2021 during construction activities. 

Compliance tool used: Information Request (IR)

Regulatory requirement:

Relevant section(s):

Company action required:

Provide: 

  1.  A description of events including dates regarding a potential heritage resource discovery. 
  2. An explanation as to whether the Heritage Resources Contingency Plan was required to be applied or not, and if so, provide evidence it was followed. 
  3. Evidence to demonstrate that contractors and TMEP employees were aware of the Heritage Resource Contingency Plan and associated procedures. 
Please provide:
1)  The mitigation plan for the chance find that was developed by the permitted archaeologist;
2)   A photograph of the 30 m flagging and buffer; and
3)  Confirmation of a spread wide reminder of the requirements in the Heritage Resources Contingency Plan was provided to Spread 5B personnel.



 

Due date: 2021-12-14

Date closed: 2022-01-18
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 5 - Indigenous Monitor Observation #1

Date & time of visit: 2021-10-22 17:00

Discipline: Socio-Economic

Categories:

Facility:

Observations:

Additional observations recorded by IAMC Indigenous Monitors participating in the CER inspection. Any compliance-related observations that require specific regulatory follow-up have been recorded above.

Observation – Indigenous Monitor

Oct,19,2021
 

 
 
Summary:
 
The Inspection went well for the day, no Non compliances to report for the day as no to little Machinery running at all on the Right of Way (ROW).
There was a Blockage in one of the Culverts at KP 994.8. The Environmental Inspector for that area dealt with the Blockage right there and then cleared fully for water flow.
 
Oct,21,2021
  
 
Summary:
 
Inspection went we well, just one outstanding Non-Compliance to Report at KP 1063.0, Sediment Control Measure Failure, Addressed to Environmental Inspector and Forman for that area. Non-Compliance being dealt with by end of Day.
 

Compliance tool used: No compliance tool used

Observation 6 - Indigenous Monitor Observation #2

Date & time of visit: 2021-10-22 17:00

Discipline: Socio-Economic

Categories:

Facility:

Observations:

Additional observations recorded by IAMC Indigenous Monitors participating in the CER inspection. Any compliance-related observations that require specific regulatory follow-up have been recorded above.

Observation – Indigenous Monitor
I attended this inspection with the CER, and my observations have been appropriately captured by the Inspection Officer observations. I have nothing further to add currently.

Compliance tool used: No compliance tool used

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program