Compliance verification activity type: Field Inspection
Team:
Regulated company: Trans Mountain Pipeline ULC
Operating company: Kinder Morgan Canada Inc
Province(s) / Territory(s):
Discipline(s):
Related events:
Rationale and scope:
Environmental inspection of spread 5B construction focusing on implementation of mitigation measures committed to in the EPP, Resource Specific Mitigation Tables, the SARA Permit and specific contingency plans. Spread 5B consists of new pipeline construction and installation of a 36 NPS pipeline, and the Spread starts at the Coquihalla Summit at KP 990.30 and ends at KP 1075.92. Areas of focus during the inspection included Heritage Resources, SARA listed species, watercourses and sediment and erosion control.
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Observation 1 - General Observations
Date & time of visit: 2021-10-28 15:00
Discipline: Environmental Protection
Categories:
Facility:
Observations:
Compliance tool used: No compliance tool used
Observation 2 - Watercourses and Wetlands
Date & time of visit: 2021-10-20 16:00
Watercourse and wetland location observed during the inspection include:KP 988+070 Wetland WT-1132 and KP 988+930 BC-582a
Observation 3 - CNC #1
Date & time of visit: 2021-10-28 14:45
At KP 1063.04, a small amount of sediment laden water was flowing across the RoW extending past the project boundaries. Erosion and sediment controls were installed however the staked straw wattles were overwhelmed by water. One straw wattle was washed over the bank.
Compliance tool used: Corrected Non-compliance (CNC)
Regulatory requirement:
Relevant section(s):
Company action required:
1. Provide evidence as to whether ESC measures were fixed as previously identified on TMEP's deficiency list.2. Complete ESC repairs as needed to mitigate inadequate ESC measures presently installed. Provide photographic evidence that these repairs have been completed.
Due date: 2021-10-29
Date closed: 2021-11-05 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Reason closed: Requirement met
Compliance achieved: Yes
Observation 4 - IR #1 Heritage Resources Contingency Plan
Discipline: Socio-Economic
The CER Inspection team was informed that a potential heritage resource was discovered at the Coquihalla River at KP 1030+150 on 8 September 2021 during construction activities.
Compliance tool used: Information Request (IR)
Provide:
Due date: 2021-12-14
Date closed: 2022-01-18 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Observation 5 - Indigenous Monitor Observation #1
Date & time of visit: 2021-10-22 17:00
Additional observations recorded by IAMC Indigenous Monitors participating in the CER inspection. Any compliance-related observations that require specific regulatory follow-up have been recorded above.Observation – Indigenous MonitorOct,19,2021
Observation 6 - Indigenous Monitor Observation #2
Additional observations recorded by IAMC Indigenous Monitors participating in the CER inspection. Any compliance-related observations that require specific regulatory follow-up have been recorded above.Observation – Indigenous MonitorI attended this inspection with the CER, and my observations have been appropriately captured by the Inspection Officer observations. I have nothing further to add currently.
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program