Compliance verification activity type: Field Inspection
Team:
Regulated company: Trans Mountain Pipeline ULC
Operating company: Kinder Morgan Canada Inc
Province(s) / Territory(s):
Discipline(s):
Related events:
Rationale and scope:
<p>TMEP Spread 3/4A Construction Inspection (OC-065, AO-003-OC-2)</p>
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Regulatory instrument number(s):
Observation 1 - Valemount Field Office and KP517+80 Bending - day 1
Discipline: Integrity Management
Categories:
Facility:
Observations:
Valemount Field Office
KP 517+80 - Bending
Compliance tool used: Information Request (IR)
Regulatory requirement:
Relevant section(s):
Company action required:
IR 1
i. Provide the NCR issued for the cold bend TMEP-S3-LTOB-0965.
ii. Provide the outstanding information requested in the inspection observation pertaining to TMEP new measures and updated corrective actions necessary to address the cold bending non-conformance with the long seam being outside of the 30 deg from neutral axis as it has been identified for the third time on this spread. Explain how these measures and corrective actions align with TMEP Quality Management Plan and how they ensure that this type of non-conformance will be addressed moving forward to avoid reoccurrence.
Due date: 2022-03-31
Date closed: 2022-04-01 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Reason closed: Requirement met
Compliance achieved: Yes
Observation 2 - Valemount Stockpile Management Site - day 1
IR 2
In accordance with the statement included in the Stockpile Site Inspection Presentation regarding the ongoing monitoring and assessment of pipe, provide information demonstrating that the pipe coating condition at the Valemount stockpile site has been confirmed to be free of any degradation due to storage, handling or transportation and that the coating performance is still valid.
Due date: 2022-04-29
Date closed: 2022-05-16 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Observation 3 - KP527+564 Coating - day 1
Date & time of visit: 2022-03-02 13:10
Compliance tool used: No compliance tool used
Observation 4 - KP528+280 Trench - day 1
Date & time of visit: 2022-03-02 14:15
Observation 5 - KP528+498 Tie-In welding - day 1
Date & time of visit: 2022-03-02 15:00
Observation 6 - KP528+498 Tie-In welding - day 2
KP 528+498
IR 3
i. Clarify the inconsistency between SMAW and Mechanized Welding Specification TMEP-MP3904 Rev. 5 referenced in the Welding Procedure Data Sheet (WPDS) TMEP-WPDS-04 Rev. 7A and the latest welding specification TMEP-MP3904 Rev. 6 which is issued for use and explain why TMEP-WPDS-04 Rev. 7A has not been updated accordingly.
ii. Explain TMEP's process in place to keep WPDS revisions for the project up to date to ensure similar inconsistencies will not occur in the future.
iii. Confirm the welding specification TMEP-MP3904 revision number currently in use for the project.
iv. Confirm that TMEP-MP3904 revision from the response iii. aligns with the Welding Procedure Specification (WPS) TMEP-WPS-04 Rev. 1 and TMEP-WPDS-04 Rev. 7A.
v. Confirm whether TMEP-MP3904 Rev. 5 currently referenced in TMEP-WPDS-04 Rev. 7A, has been filed with the CER as required by Condition 111 of the Certificate OC-065. If not, provide rationale.
vi. Provide a comparison table among TMEP-MP3904 Rev. 4, Rev. 5 and Rev. 6, explaining the changes from one revision to another including rationale.
Due date: 2022-05-13
Observation 7 - KP528+805 - day 2
Date & time of visit: 2022-03-03 10:45
Valemount Field Office:
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or