Compliance verification activity type: Field Inspection
Team:
Regulated company: Kinder Morgan Utopia Ltd.
Operating company: Kinder Morgan Utopia Ltd. (KM or Utopia)
Province(s) / Territory(s):
Discipline(s):
Rationale and scope:
Damage Prevention and Environment Protection Program Inspections to verify compliance with the National Energy Board Act (NEB Act), the National Energy Board Onshore Pipeline Regulations (OPR), the National Energy Board Pipeline Damage Prevention Regulations – Obligations of the Pipeline Companies (DPR-O), National Energy Board Pipeline Damage Prevention Regulations – Authorizations (DPR-A) and Canadian Standard Of Canada Oil and Gas Pipeline System (CSA Z662-15). Kinder Morgan Utopia Ltd - Canadian-Eastern Section - Detroit River Crossing operational inspection.
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Observation 1 - General - Damage Prevention and Environment Programs
Date & time of visit: 2019-06-12 09:00
Discipline: Damage Prevention
Categories:
Facility:
Observations:
The National Energy Board (NEB) Inspection Team met with Kinder Morgan Utopia (KM or Utopia) and conducted a meeting and documentation reviews prior to the field right-of-way (RoW) inspections of the Utopia Pipeline. The following list outlines documents reviewed and information provided during the meeting and further to the field inspections:
Compliance tool used: No compliance tool used
Observation 2 - General - Damage Prevention Program field inspections
Observation 3 - Environment - Field Inspections
Discipline: Environmental Protection
Observation 4 - Liquid O&M Procedures, Construction Near Company Facilities Manual
Further to the review of Utopia's Liquid O&M Procedures, Construction Near Company Facilities, Attachment 6 - Supplemental Canada Cochin ULC & Utopia Ltd backfilling activities, the documentation states that a minimum of 3 days advance notice is required for notifying the pipeline company prior to backfilling over a pipe whereas the Damage Prevention Regulations – Authorizations require a minimum of 24hrs advance notice.Companies are not permitted to impose requirements that extend beyond the limits of what is stated in the regulations with respect to areas where the company has no regulatory authority.
Compliance tool used: Notice of Non-compliance (NNC)
Regulatory requirement:
Relevant section(s):
Company action required:
Utopia will ensure that its relevant procedures accurately reflect the NEB regulatory requirements for backfill notification. Utopia shall provide the NEB with confirmation by way of email that the corrective action is complete.
Due date: 2019-08-30
Date closed: 2019-09-10 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Reason closed: Requirement met
Compliance achieved: Yes
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program