Compliance Verification Activity Report: CV2223-287 - Enbridge Pipelines Inc.

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2223-287
Start date: 2022-11-16
End date: 2022-11-17

Team:

Regulated company: Enbridge Pipelines Inc.

Operating company: Enbridge Pipelines Inc.

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

Field inspection of the active remediation being conducted at a site near Lorne, MB and Swan Lake First Nation (REM2018-032)

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Information Request

IR from CER (Information Request sent from CER to company)
Remediation-related Plans and Procedures

Legislative Requirement : Onshore Pipeline Regulations (OPR) 2020-03-16

Sections of the Act

  • Onshore Pipeline Regulations (OPR) 2020-03-16
    • 48 A company shall develop, implement and maintain an environmental protection program that anticipates, prevents, manages and mitigates conditions that could adversely affect the environment.

Theme and Categories

Environmental Protection
  • Soils and Soil Productivity
    • Soil Handling
    • Chemical Spills/Releases
  • Surface Water Management
    • Containment and Drainage Structures
  • Water Bodies - Non-Fish-bearing
    • Chemical Spills/Releases
    • Sedimentation/Turbidity
    • Reclamation
  • Water Bodies - Fish-bearing
    • Disturbance
    • Chemical Spills/Releases
  • Groundwater
    • Monitoring and Testing
    • Chemical Spills/Releases
  • Air Quality
    • Emissions Control/Monitoring
  • Housekeeping
    • Temporary Structures

Due Date : 2022-11-15

Review Response
Acceptable

Follow-up Action
None

Observations (no outstanding follow-up required)

Observation 1 - MP708.35 Remediation Field Inspection

Date & time of visit: 2022-11-17 11:45

Discipline: Environmental Protection

Categories:

Facility:

Observations:

The Inspection Team conducted a field inspection of the active remediation work ongoing at Line 2, MP708.35:

Soil and groundwater management:


Air quality monitoring:
Aquatic Receptor (Creek) Management  
Engagement

Compliance tool used: No compliance tool used

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program