Compliance Verification Activity Report: CV1920-126 - New Brunswick Power Transmission Corporation

Overview

Compliance verification activity type: Field Inspection

Activity #: CV1920-126
Start date: 2019-08-19
End date: 2019-08-22

Team:

Regulated company: New Brunswick Power Transmission Corporation

Operating company: New Brunswick Power Corporation

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

Verify compliance with NEB requirements for International Power Lines, including compliance to construction safety manual submitted under Condition 11 of Order EP-304. Focus areas to include contractor oversight.

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Regulatory instrument number(s):

Observations (no outstanding follow-up required)

Observation 1 - General Observations

Date & time of visit: 2019-08-21 17:00

Discipline: Safety Management

Categories:

Facility:

Observations:

General Observations:
L0155 & L0163 Line Work, Houlton Staging Area & Substation, and Woodstock Terminal:

Compliance tool used: No compliance tool used

Observation 2 - CNC #1 - Replace Grounding Belt at Terminal main gate

Date & time of visit: 2019-08-20 14:00

Discipline: Safety Management

Categories:

Facility:

Observations:

Gates along the facility fencing were observed to be functional and grounded, with exception to the main Terminal gate where a worn, frayed grounding belt was observed at the main gate fencing of the Woodstock Terminal.

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Company shall replace the grounding belt.

Due date: 2019-08-22

Date closed: 2019-08-22
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 3 - CNC #2 Standing on Mid-Rail of Elevated Work Platform

Date & time of visit: 2019-08-20 13:30

Discipline: Safety Management

Categories:

Facility:

Observations:

An NB Power employee was observed working from height on a JLG boom lift.  The employee stepped up onto the mid rail of the work platform in order to complete his task.

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Ensure employees are both aware of and following any legislated requirements, company requirements and manufacturer operators and safety manuals related to work in elevated work platforms.

Due date: 2019-08-20

Date closed: 2019-08-20
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 4 - NNC #1 Worker Assigned Task Without Required Training

Date & time of visit: 2019-08-20 15:00

Discipline: Safety Management

Categories:

Facility:

Observations:

An NB Power employee was observed working in an unsafe manner from an elevated work platform.  The activity was immediately stopped by company representatives but during their subsequent incident review, the company realized that the worker did not have all current required training for the assigned task.

Compliance tool used: Notice of Non-compliance (NNC)

Regulatory requirement:

Relevant section(s):

Company action required:

The company is required to evaluate and determine potential gaps within their processes that would allow workers to be assigned tasks without first ensuring that they are competent to complete that task.  The company shall then take corrective/preventive actions to address identified gaps.

Due date: 2019-10-11

Date closed: 2019-10-03
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program