Compliance verification activity type: Field Inspection
Team:
Regulated company: Pouce Coupé Pipe Line Ltd. as agent and general partner of the Pembina North Limited Partnership
Operating company: Pembina North Limited Partnership
Province(s) / Territory(s):
Discipline(s):
Rationale and scope:
Spirit River and Taylor pump stations - Assess completion of preventive maintenance, inspection and testing on safety systems and safeguards per prescribed frequencies under CSA Z662 and company programs; Assess implementation of identification, evaluation and control of process hazards including established process hazard inventory; Assess control of hazardous energy including LOTO.
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Observation 1 - Information caviardée conformément au paragraphe 144(5) du Code canadien du travail
This information has been redacted pursuant to Section 144(5) of the Canada Labour Code
Observation 2 - General Observations
Date & time of visit: 2021-03-05 08:30
Discipline: Safety Management
Categories:
Facility:
Observations:
Compliance tool used: No compliance tool used
Observation 3 - Taylor Pump Station
Date & time of visit: 2021-03-02 11:00
Observation 4 - Spirit River Pump Station
Date & time of visit: 2021-03-10 14:00
Observation 5 - CNC 1: Taylor Pump Station Emergency Shower
CER Inspection Officers (IOs) observed an emergency shower positioned adjacent to a low voltage electrical panel. The company advised that the shower was obsolete and should have been tagged out of service or removed.
Compliance tool used: Corrected Non-compliance (CNC)
Regulatory requirement:
Relevant section(s):
Company action required:
The company shall make the shower inoperable or remove the electrical hazards.
Due date: 2021-03-03
Date closed: 2021-03-03 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Reason closed: Requirement met
Compliance achieved: Yes
Observation 6 - CNC 2: Taylor Pump Station Fence Grounding
IOs observed that two of the copper strands on the grounding conductor between the perimeter fence entrance gate and the ground clamp were broken. IOs further observed other gates had not been bonded to ground.
The company shall bond gates to ground.
Due date: 2021-03-05
Date closed: 2021-03-05 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Observation 7 - CNC 3: Taylor Pump Station Lock-Out/Tag-Out
Date & time of visit: 2021-03-02 12:00
IOs observed a lock-box containing one key in the motor control center (MCC) building. The box was sealed but no associated lock-out form could be found. Upon further inquiry, IOs learned the lockbox contained a key for legacy keyed-alike 'red' isolation locks.Company representatives stated the red isolation locks were replaced with unique-keyed blue locks in 2018. IOs observed, however, that legacy red locks were still used to lock isolation devices within the MCC. Company representatives were not able to verify control of keys for these legacy locks.
The company shall replace the keyed alike locks with individually keyed locks in accordance with Pembina's Isolation from Energy Sources Standard.
Observation 8 - CNC 4: Taylor Pump Station Signage
CER Inspection Officers (IOs) observed a faded 'DANGER - OVERHEAD POWER LINES' sign outside the entrance of Taylor Pump Station.
The company shall replaced the faded warning sign.
Observation 9 - CNC 5: Spirit River Pump Station Switching Gear Panels
Date & time of visit: 2021-03-03 11:00
CER Inspection Officers (IOs) observed several 4160 volt switching gear rear panels within the motor control center (MCC) that had missing or loose bolts.
The company shall replace missing bolts and securely fasten the loose ones.
Observation 10 - CNC 6: Spirit River Pump Station Warning Sign
Date & time of visit: 2021-03-03 12:00
CER Inspection Officers (IOs) observed that a warning sign 'NOTICE - TRUCKERS ATTACH GROUND CABLES' located at the knock-out drum truck out box had fallen off and wasn't visible.
The company shall replace the warning sign.
Observation 11 - CNC 7: Taylor Pump Station Switching Gear Panels
Observation 12 - NNC 1: Spirit River PHA Validation
Date & time of visit: 2021-03-03 08:00
IO reviewed Hazard and Operability (HAZOP) Studies:
Compliance tool used: Notice of Non-compliance (NNC)
Provide evidence that the process hazard analysis for Spirit River Pump Station has been revalidated in accordance with Pembina's standard.
Due date: 2021-04-16
Date closed: 2021-04-27 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Observation 13 - NNC 2 - Control of Process Hazards
CER Inspection Officers (IOs) requested evidence that process hazards had been identified, evaluated, analyzed, and controlled for Taylor, Sweetwater, and Spirit River pump Stations. The company provided the following documents:
IOs selected a sample of recommendations and parking lot items from the Hazard and Operability Analysis (HAZOP) to verify the effective implementation of the Pembina Engineering Specification: Process Hazards Analysis (PHA) ESS 7.01, hereafter referred to as ‘PHA standard’. IOs found no evidence that recommendations and parking lots items identified in the HAZOP studies had been managed according to section 10 ‘Managing PHA Recommendations’ of the PHA standard:
The Company shall demonstrate to the Inspection Officer effective implementation of the processes used to identify, analyze, evaluate, control and communicate process hazards and potential process hazards (hazards) for all CER regulated Pouce Coupé Pipe Line Ltd. facilities. The response must include, at a minimum:
Due date: 2021-05-21
Date closed: 2021-05-20 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Observation 14 - IR 1 - Fire Eyes Inspection Frequency
CER Inspection Officers observed three fire eyes in the pump building at Spirit River Pump Station last inspected on 15 July 2020.
Compliance tool used: Information Request (IR)
Provide the company established inspection and/or maintenance interval for fire eyes.
Due date: 2021-03-12
Date closed: 2021-03-12 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program