Compliance Verification Activity Report: CV2223-037 - Enbridge Pipelines Inc.

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2223-037
Start date: 2022-10-11
End date: 2022-10-13

Team:

Regulated company: Enbridge Pipelines Inc.

Operating company: Enbridge Pipelines Inc.

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

Field inspection of decommissioning activities for the Line 3 Decomissioning. Focus on Segment 2 Segmentation/Isolation/Railway Fill scheduled for August to October. Segment 2 is 354.58 km in length from Kerrobert Terminal KP 351.291 to Regina Terminal KP 704.202. 

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Observations (no outstanding follow-up required)

Observation 1 - General Right-of-Way (RoW)

Date & time of visit: 2022-10-11 13:00

Discipline: Environmental Protection

Categories:

Facility:

Observations:

General

Kilometre Posts (KPs) observed included:
697.355 and 697.412
660.917
493.564 and 493.630
493.010
489.439
506.668 and 523.966
585.500

Three types of construction activities were conducted on the RoW as part of the decommissioning Project including environmental segmentations, valve isolations, and railway fills.

-No construction activity was observed except for at one site where the crew was finishing up removal of mats and underlain geotextile. At this site, there was still a small amount of topsoil yet to be feathered out (weather conditions today were too windy to complete this). The windy conditions did not appear to be creating additional ground soil or topsoil pile erosion.
-Housekeeping appeared adequate and tidy.
-Signage was installed including biosecurity measures required to be taken, and construction warning signage.
-Enbridge Lead 
Indigenous Monitor mentioned that several cultural walks have been undertaken along the Line 3 RoW with no issues identified.
-One site was seeded with a grass mix inside Regina city limits.

-Decommissioning activities were completed inside facilities observed (i.e. previously disturbed sites). At one site, backfilling has yet to be completed, however Enbridge representatives explained that Operations has taken over this site because other maintenance work is also underway.
-At a couple of sites, there was no ground disturbance during decommissioning activities.
-No environmental aspects (e.g. wetlands, creeks, etc) appeared to be disturbed by decommissioning activities.
-No signs of soil erosion or subsidence, and re-contouring appears adequate.
-No admixing of soils observed.
-No signs of residual staining from product.

Biosecurity Measures
-CER, IAMC, and Enbridge staff washed vehicles at a car wash prior to field observations. Prior to entering each site by foot, all staff work boots were sprayed with a 1-2% bleach solution. 

Compliance tool used: No compliance tool used

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program