Compliance verification activity type: Field Inspection
Team:
Regulated company: TransCanada Keystone Pipeline GP Ltd.
Operating company: TransCanada Keystone Pipeline GP Ltd
Province(s) / Territory(s):
Discipline(s):
Related events:
Rationale and scope:
Safety oversight of operations activities at PS 15 Caron and PS 17 Regina Pump Stations. Verify implementation of corrective action plans from CV1819-261 (COSHR Part X and NFC Parts 3 and 4 and Part XIX Hazard Prevention Program for pump stations). Verify compliance with CER Act, OPR Regulations, CSA Z662, CLC Part II, COHSR, and company specific procedures.
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Observation 1 - General Observations Keystone
Date & time of visit: 2020-02-11 09:00
Discipline: Safety Management
Categories:
Facility:
Observations:
Compliance tool used: No compliance tool used
Observation 2 - Information caviardée conformément au paragraphe 144(5) du Code canadien du travail
This information has been redacted pursuant to Section 144(5) of the Canada Labour Code
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program