Compliance Verification Activity Report: CV1819-004 - 2193914 Canada Limited

Overview

Compliance verification activity type: Field Inspection

Activity #: CV1819-004
Start date: 2019-03-28
End date: 2019-03-28

Team:

Regulated company: 2193914 Canada Limited

Operating company: Enbridge Gas Inc. (Enbridge Gas)

Province(s) / Territory(s):

Discipline(s):

Rationale and scope:

Field Inspection of 2193914 Canada Limited, operated by Enbridge Gas Inc. Safety Program focus, to verify compliance with the National Energy Board Onshore Pipeline Regulations (OPR) and company-specific requirements.

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Observations (no outstanding follow-up required)

Observation 1 - Winston Churchill & Steeles Station

Date & time of visit: 2019-03-28 10:00

Discipline: Safety Management

Categories:

Facility:

Observations:

Compliance tool used: No compliance tool used

Observation 2 - Winston Churchill & Steeles Station – Communications Building

Date & time of visit: 2019-03-28 10:45

Discipline: Safety Management

Categories:

Facility:

Observations:

Fire extinguisher in communications building had up to date annual certification and monthly inspection tag. This fire extinguisher was on the floor of the building and not installed as prescribed in Clause 6.1.3.4 of NFPA 10 – Standard for Portable Fire Extinguisher, referenced in Clause 10.2.7.2 (e) of CSA Z662, which is in non-compliance to the paragraph 4(1)(d) of the National Energy Board Onshore Pipeline Regulations (OPR).

OPR
Paragraph 4(1)(d)
4 (1) When a company designs, constructs, operates or abandons a pipeline, or contracts for the provision of those services, the company shall ensure that the pipeline is designed, constructed, operated or abandoned in accordance with the applicable provisions of (d) CSA Z662, if the pipeline transports liquid or gaseous hydrocarbons.
 
CSA Z662
Clause 10.2.7.2 (e) of CSA Z662  
Operating companies shall maintain appropriate firefighting equipment. Such equipment shall be (e) positioned as specified in NFPA standards.
 
NFPA 10 – Standard for Portable Fire Extinguishers
Clause 6.1.3.4
Portable fire extinguishers other that wheeled extinguishers shall be installed using any of the following means: (1) Securely on a hanger intended for the extinguisher (2) In a bracket incorporating releasing straps or bands supplied by the extinguisher manufacturer (3) in a listed bracket incorporating releasing straps or bands approved for such purpose (4) In approved cabinets or wall recesses.

Compliance tool used: Notice of Non-compliance (NNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Company is to demonstrate the portable fire extinguisher has been installed in accordance with NFPA 10. 

Due date: 2019-04-02

Date closed: 2019-04-02
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 3 - Lisgar Gate Station

Date & time of visit: 2019-03-28 11:00

Discipline: Safety Management

Categories:

Facility:

Observations:

Compliance tool used: No compliance tool used

Observation 4 - Gore Road Valve Site

Date & time of visit: 2019-03-28 11:55

Discipline: Safety Management

Categories:

Facility:

Observations:

Compliance tool used: No compliance tool used

Observation 5 - Gore Road Valve Site - Vegetation

Date & time of visit: 2019-03-28 14:00

Discipline: Safety Management

Categories:

Facility:

Observations:

Woody overgrown vegetation was present within the valve site, which not as prescribed in Clause 10.6.2 - Vegetation control, 10.5.8 Environmental Effects, and Clause N.10.2 - External interference of CSA Z662 which is in non-compliance to the paragraph 4(1)(d) of the National Energy Board Onshore Pipeline Regulations (OPR).

OPR
Paragraph 4(1)(d)
4 (1) When a company designs, constructs, operates or abandons a pipeline, or contracts for the provision of those services, the company shall ensure that the pipeline is designed, constructed, operated or abandoned in accordance with the applicable provisions of (d) CSA Z662, if the pipeline transports liquid or gaseous hydrocarbons.
 
CSA Z662
Vegetation control
10.6.2
Where the terms of the easement permit, vegetation on rights-of-way shall be controlled to maintain clear visibility from the air and provide ready access for maintenance crews.
 
Environmental effects
10.5.8 (j)  
Operating companies shall establish effective prevention and control measures to maintain the effect of pipeline system operations upon the environment within acceptable levels. Precautions listed in Clause 6.6 shall be taken to avoid uncontrolled fires.
Note: Matters that should be considered include the following:
(j) aesthetics;
 
External interference
Clause N.10.2 (c)
The options that may be used to reduce the frequency of failure and damage incidents associated with external interference include the following, as applicable:  (c) vegetation control to improve right-of-way visibility.
 

Compliance tool used: Notice of Non-compliance (NNC)

Regulatory requirement:

Relevant section(s):

Company action required:

To ensure vegetation is controlled, aesthetics are maintained and to minimize external interference, company is to demonstrate it is in compliance with NEB OPR 4(1)(d) with respect to vegetation control.

Due date: 2019-04-05

Date closed: 2019-04-02
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 6 - Pine Valley Road Site

Date & time of visit: 2019-03-28 14:30

Discipline: Safety Management

Categories:

Facility:

Observations:

Compliance tool used: No compliance tool used

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program