Compliance verification activity type: Field Inspection
Team:
Regulated company: NOVA Gas Transmission Ltd.
Operating company: NOVA Gas Transmission Ltd.
Province(s) / Territory(s):
Discipline(s):
Related events:
Rationale and scope:
Verification to site specific safety plan, contractor oversight and verify whether adequate controls are in place to prevent recurrence. Assess controls in place pertaining to INC2022-147.
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Observation 1 - Field Inspection of Incident Site
Date & time of visit: 2022-08-25 13:00
Discipline: Safety Management
Categories:
Facility:
Observations:
Compliance tool used: No compliance tool used
Observation 2 - NNC 1 - Communicating Inspector Responsibilities
Date & time of visit: 2022-10-03 17:00
On 25 August 2022, CER Inspection Officers (IOs) conducted a field inspection in response to a contractor injury NGTL reported to the CER on 24 August 2022.
During the inspection, IOs spoke with the welding inspector (inspector) assigned to the injured worker's tie-in crew. According to statements obtained:
On 31 August 2022, CER Inspection Officers (IOs) requested a list of the inspector's duties (IR 2.2). NGTL's response states the inspector's responsibilities include, but are not limited to:
Based on NGTL's response to IR 2.2 and onsite interviews, the CER IOs believe that NGTL had not effectively communicated the safety oversight expectations of its company representative (welding inspector) who was positioned near the ditch at the time of the incident.
Compliance tool used: Notice of Non-compliance (NNC)
Regulatory requirement:
Relevant section(s):
Company action required:
Describe how NGTL will ensure company representatives (inspectors) understand the scope of their safety oversight responsibilities, including the general responsibilities to inspect and monitor the contractor's work as outlined in NGTL's safety management plan.
Due date: 2023-02-10
Date closed: 2023-02-10 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Reason closed: Requirement met
Compliance achieved: Yes
Observation 3 - NNC 2 - Hazard Identification and Control
During a field inspection on 25 August 2022, CER Inspection Officers (IOs) were told that on 24 August 2022, the contractor was performing a "test fit" in preparation for a tie-in. The pipe did not align properly, and workers were attempting to free the pipe from external alignment clamps when the pipe moved unexpectedly, pinching a worker between the pipe and the ditch bank resulting in a serious injury.
In IR 1.3, IOs asked if the company had a contingency plan for "test fits." In their response, NGTL stated that if the pipe does not fit properly, the [alignment] clamps are loosened, and the pipe is removed from the ditch per industry standard practice.
NGTL provided the IOs with copies of the FLHA, JHA, and tailgate meeting from the day of injury, all signed by an NGTL representative. Although the FLHA and JHA identify pinch points as a general hazard, hazards and potential challenges related to removing the unwelded pipe from clamps, including the potential for unexpected pipe movement due to stored energy for a large diameter pipe, are not identified.
During the field inspection, IOs observed two egress points from the ditch, both exiting from the area where the pipe was suspended during the test fit. Although the injured worker's entry into the ditch may have been unexpected, it's not clear how workers already in the ditch would have safely exited without being exposed to the potential movement of the pipe if attempts to free the pipe from the clamps were not successful.
Due date: 2022-12-16
Date closed: 2023-02-23 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program