Compliance Verification Activity Report: CV2122-294 - Enbridge Pipelines Inc.

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2122-294
Start date: 2021-08-30
End date: 2021-09-02

Team:

Regulated company: Enbridge Pipelines Inc.

Operating company: Enbridge Pipelines Inc.

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

Inspection of the Enbridge Line 3 decommissioning activities related to Segment 4 in Manitoba (KP 980.344 Ex-Cromer to 1242.403 Gretna Terminal).

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Regulatory instrument number(s):

Observations (no outstanding follow-up required)

Observation 1 - General Observations

Date & time of visit: 2021-09-02 16:00

Discipline: Environmental Protection

Categories:

Facility:

Observations:

.Overall Observations

 
MB-CL-2014 
MB-RF-7018-1 & MB-RF-7018-2 
MB-IS-3044West Souris Station 
MB-RF-7019-1 & MB-RF-7019-2 
MB-SG-4048 
MB-IS-3047 
MB-SG-4051 
MB-SG-3051 
Glenboro Station 
MB-IS-3050

Compliance tool used: No compliance tool used

Observation 2 - IR No. 1 - Labelling of Hazardous Materials

Discipline: Environmental Protection

Categories:

Facility:

Observations:

The MSDS for One Shot XS indicates that the solution is hazardous to human health and fish and warns users to prevent contact with skin and flush immediately if contact occurs. The solution, although diluted at a 40:1 ratio, was observed in an unlabeled container and the lid was not secure.

The Decommissioning EPP does not outline requirements for labelling hazardous materials, however Section 47 of the OPR requires "A company shall develop, implement and maintain a safety management program that anticipates, prevents, manages and mitigates potentially dangerous conditions and exposure to those conditions during all activities relating to construction, operation, maintenance, abandonment and emergency situations."

In reviewing the Project's documentation and requirements, the Officer was unable to locate the Construction Safety Manual (or equivalent) for the Decommissioning Activities. 

Compliance tool used: Information Request (IR)

Regulatory requirement:

Relevant section(s):

Company action required:

  1. Explain which Construction Safety Manual (or equivalent) Enbridge is applying to the Decommissioning activities for the Project, and confirm whether or not the applicable manual outlines requirements for hazardous materials handling and labelling. 
  2. Confirm how Enbridge has communicated the requirements to the applicable subcontractor to prevent reoccurence. 

Due date: 2021-10-01

Date closed: 2021-09-30
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 3 - IR No. 2 - Soil Sampling Results from MB-RF-7019-1

Discipline: Environmental Protection

Categories:

Facility:

Observations:

When crossing the track to 7019-1 site the Officer and IAMC Indigenous monitor smelled a strong VOC odor that appeared to be associated with one rig mat that had an area of staining. Company rep stated they smelled manure/wet wood but checked it with their 4-head gas monitor and did not get a hit. Enbridge confirmed that when the mats are removed they will collect a soil sample from below the rig mat of concern to confirm contaminants have not entered the soil. Enbridge stated it will conduct confirmatory sampling under the potentially contaminated rig mat after its removal. 

Compliance tool used: Information Request (IR)

Regulatory requirement:

Relevant section(s):

Company action required:

Provide the sampling results upon receipt, and if exceedances are identified explain what Enbridge has or will do to address any exceedances.
 

Due date: 2021-10-15

Date closed: 2021-09-30
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 4 - IR No. 3 - Environmental Training

Discipline: Environmental Protection

Categories:

Facility:

Observations:

Section 5.3 of the EPP states "Ensure construction foremen have the requirements associated with spill containment and clean-up of equipment leak. Ensure Contractor equipment operators and foremen are aware of the Fuels and Hazardous Materials Spill Contingency Plan [FHMSCP] (Appendix D4)." One Operator the Officer spoke with, and their Foreman, explained the correct steps to implement, but neither were able to name or even generally refer to the FHMSCP. 

Enbridge provided the training slide deck that is used for the Level 1 training which the Operator and all other workers are required to take. The applicable slide for Environmental incidents and Spills outlines the requirements for reporting environmental incidents and spot spills, but does not include any information on what actions they should take in the event of spills (ex: steps outlined in the FHMSCP). Given the first step in the FHMSCP states "the first person on the scene will follow the actions presented", it is unclear how the training provided will ensure that all workers on site are aware of the steps to take in the event of a spill when no details on those steps are provided in the training. 

Compliance tool used: Information Request (IR)

Regulatory requirement:

Relevant section(s):

Company action required:

  1. Explain how Enbridge's Level 1 training adequately prepares all workers to implement the steps outlined in the FHMSCP; or
  2. Explain what updates have been made to the Level 1 training. 

Due date: 2021-10-01

Date closed: 2021-09-30
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program