Compliance Verification Activity Report: CV1920-290 - NOVA Gas Transmission Ltd.

Overview

Compliance verification activity type: Field Inspection

Activity #: CV1920-290
Start date: 2019-12-09
End date: 2019-12-12

Team:

Regulated company: NOVA Gas Transmission Ltd.

Operating company: TransCanada PipeLines Limited

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

Safety oversight of construction activities of NOVA Gas Transmission Ltd. (NGTL) Clearwater West Expansion Project. Field Inspection of Grande Prairie Mainline Loop No. 3 (Elmworth Section 1) and Loop No. 2 (Huallen Section). Assess compliance with the Onshore Pipeline Regulations (OPR), for the safety management program, including worker safety, contractor oversight and construction safety manuals / site specific safety plans. Observe compliance with respect to Canada Labour Code Part II, where applicable.

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Observations (no outstanding follow-up required)

Observation 1 - Project Yard

Date & time of visit: 2019-12-12 17:00

Discipline: Safety Management

Categories:

Facility:

Observations:

Compliance tool used: No compliance tool used

Observation 2 - Elmworth Section

Date & time of visit: 2019-12-10 17:00

Discipline: Safety Management

Categories:

Facility:

Observations:

Compliance tool used: No compliance tool used

Observation 3 - Huallen Section

Date & time of visit: 2019-12-11 17:00

Discipline: Safety Management

Categories:

Facility:

Observations:

Compliance tool used: No compliance tool used

Observation 4 - Contractor Oversight

Date & time of visit: 2019-12-12 16:00

Discipline: Safety Management

Categories:

Facility:

Observations:

Compliance tool used: No compliance tool used

Observation 5 - Information caviardée conformément au paragraphe 144(5) du Code canadien du travail

This information has been redacted pursuant to Section 144(5) of the Canada Labour Code

Observation 6 - IR1 Compressed breathing air compressors

Date & time of visit: 2019-12-11 13:30

Discipline: Safety Management

Categories:

Facility:

Observations:

While onsite, CER inspectors were unable to determine if the air compressors used for supplied air have been inspected as required.

Alberta OHS applies with respect to the contractor's employees (workers), as is noted in the site specific safety plans submitted as the construction safety manual under Onshore Pipeline Regulations (OPR) section 20.  The Alberta OHS Code requirement, Personal Protective Equipment, Respiratory Protective Equipment, Quality of breathing air, s. 249, states:


OCCUPATIONAL HEALTH AND SAFETY CODE
Quality of breathing air
249(1)
An employer must ensure that air used in a self-contained breathing apparatus or an air line respirator
(a) is of a quality that meets the requirements of Table 1 of CSA Standard Z180.1-00 (R2005), Compressed Breathing Air and Systems, and
(b) does not contain a substance in a concentration that exceeds 10 percent of its occupational exposure limit.
249(2) Subsection (1)(b) does not apply to substances listed in Table 1 of CSA Standard Z180.1-00 (R2005), Compressed Breathing Air and Systems.
 
 

Compliance tool used: Information Request (IR)

Regulatory requirement:

Relevant section(s):

Company action required:

For the purpose of completing this inspection, provide documentation demonstrating that the company ensures its contractors' compliance to the Alberta OHS Code Part 18, Personal Protective Equipment, section 249, with respect to respiratory protective equipment.

Due date: 2020-01-13

Date closed: 2020-01-15
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 7 - IR2: Field Level Hazard Assessment Review

Date & time of visit: 2019-12-11 15:00

Discipline: Safety Management

Categories:

Facility:

Observations:

CER inspectors were told that the TC Energy lead safety inspector routinely reviews contractors' Field Level Hazard Assessment (FLHA) for the purpose of quality assurance. CER inspectors were not able to make inquiries to the lead safety inspector as he was unable to participate in the inspection at the time inspectors were on site.  

Compliance tool used: Information Request (IR)

Regulatory requirement:

Relevant section(s):

Company action required:

For the purpose of completing this inspection, provide the documented results of TC Energy's in depth review of the contractor's Field Level Hazard Assessments.  

Due date: 2020-01-31

Date closed: 2020-01-31
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 8 - IR3: Coating Substance - Worker Protection

Date & time of visit: 2019-12-11 13:00

Discipline: Safety Management

Categories:

Facility:

Observations:

Compliance tool used: Information Request (IR)

Regulatory requirement:

Relevant section(s):

Company action required:

For the purpose of completing the inspection, provide all other Safety Data Sheets for the coating application and the company's documented requirement for mask and cartridge replacement or maintenance.

Due date: 2020-01-31

Date closed: 2020-01-31
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 9 - IR4: Outdoor atmospheric testing - Coating

Date & time of visit: 2019-12-11 13:00

Discipline: Safety Management

Categories:

Facility:

Observations:

Compliance tool used: Information Request (IR)

Regulatory requirement:

Relevant section(s):

Company action required:

For the purpose of completing the inspection, provide documentation demonstrating that the company has assessed the immediate work area of the coating crew to determine if appropriate respiratory protection controls are in place.


 

Due date: 2020-01-17

Date closed: 2020-01-17
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 10 - IR5: Direct Pipe Install

Date & time of visit: 2019-12-10 13:30

Discipline: Safety Management

Categories:

Facility:

Observations:

The Direct Pipe Installation (DPI) activity was not observable at the time of the field inspection. 
For purpose of inspection, provide a schedule with dates of the stages of the DPI, in particular the dates of worker entries into the pipe that are planned, and the purpose of each planned entry. The inspector's interest is in the DPI method, is on safety risks and controls, primarily confined space entry, as managed by the company with respect to the DPI contractor and its workers.
 

Compliance tool used: Information Request (IR)

Regulatory requirement:

Relevant section(s):

Company action required:

Provide the DPI schedule and information on the method and hazard controls during the DPI, particularly with respect to confined space entry.

Due date: 2020-01-22

Date closed: 2020-01-24
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program