Compliance verification activity type: Field Inspection
Team:
Regulated company: TransCanada PipeLines Limited
Operating company: TransCanada PipeLines Limited
Province(s) / Territory(s):
Discipline(s):
Related events:
Rationale and scope:
Safety oversight of operations activities at CS 13 Caron and CS 17 Regina Compressor Stations. Verify implementation of corrective action plans from CV1819-261 (COHSR Part X and NFC Parts 3 and 4 and Part XIX Hazard Prevention Program for the compressor station). Verify compliance with CER Act, OPR regulations, CLC Part II, COHSR, and CSA Z662.
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Observation 1 - General Observations Compressor Station 13 & 17
Date & time of visit: 2020-02-11 13:10
Discipline: Safety Management
Categories:
Facility:
Observations:
Compliance tool used: No compliance tool used
Observation 2 - Information caviardée conformément au paragraphe 144(5) du Code canadien du travail
This information has been redacted pursuant to Section 144(5) of the Canada Labour Code
Observation 3 - CNC 1 - electrical grounding (Compressor Station 13)
Date & time of visit: 2020-02-11 14:00
CER staff observed flammable liquid safety cabinets in the paint room of Caron Station that were not bonded to ground. TC Energy Grounding Design Standard [TEN-EL-ELGND-GLE Electrical Grounding Design Standard (CAN-US-MEX)] section 3.5.2 requires grounding of all conductive, non-current carrying equipment and materials in hazardous areas subject to static voltage buildup.
Compliance tool used: Corrected Non-compliance (CNC)
Regulatory requirement:
Relevant section(s):
Company action required:
The flammable liquid cabinets in the paint room shall be bonded to an earth ground.
Due date: 2020-02-11
Date closed: 2020-02-11 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Reason closed: Requirement met
Compliance achieved: Yes
Observation 4 - CNC 2 - electrical grounding (Compressor Station 17)
Date & time of visit: 2020-02-12 11:00
CER staff observed flammable liquid safety cabinets in the paint room of Regina station that were not bonded to earth ground. TC Energy Grounding Design Standard [TEN-EL-ELGND-GLE Electrical Grounding Design Standard (CAN-US-MEX)] section 3.5.2 requires grounding of all conductive, non-current carrying equipment and materials in hazardous areas subject to static voltage buildup.
Due date: 2020-02-13
Date closed: 2020-02-13 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
There are no observations with outstanding follow-up
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program
Observation 5 - Information caviardée conformément au paragraphe 144(5) du Code canadien du travail