Compliance verification activity type: Field Inspection
Team:
Regulated company: Trans Mountain Pipeline ULC
Operating company: Kinder Morgan Canada Inc
Province(s) / Territory(s):
Discipline(s):
Related events:
Rationale and scope:
TMX Spread 7B as well as Burnaby Terminal and Westridge Marine Terminal - Assess field implementation of the environmental protection plan and association resource specific plans for ongoing construction activities; verify mitigation measures at watercourse crossings, adequate erosion and sediment control measures. Inspection included Holmes Creek and inadvertent fluid release site at KP1167.9 (Mary Hill Bypass).
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Additional Project-specific requirements or conditions:
Observation 1 - General Observations Spread 7B
Date & time of visit: 2022-06-14 10:00
Discipline: Environmental Protection
Categories:
Facility:
Observations:
Soils and Soil Productivity
Compliance tool used: No compliance tool used
Observation 2 - Burnaby Terminal
Date & time of visit: 2022-06-16 09:00
Observation 3 - Westridge Terminal
Date & time of visit: 2022-06-16 13:00
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program