Compliance verification activity type: Field Inspection
Team:
Regulated company: Trans Mountain Pipeline ULC
Operating company: Trans Mountain Pipeline ULC
Province(s) / Territory(s):
Discipline(s):
Related events:
Rationale and scope:
An environmental inspection was conducted to assess reclamation work of the O&M reactivation section in Jasper National Park and Mount Robson Provincial Park. Focus was on measures at the major watercourse crossing replacements as well as nearby dig sites. Also assessed work on the installation of the fibre optics line through the park.
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Regulatory instrument number(s):
Observation 1 - General Observations
Date & time of visit: 2022-09-21 08:00
Discipline: Environmental Protection
Categories:
Facility:
Observations:
Trans Mountain representatives stated:
Compliance tool used: No compliance tool used
Observation 2 - Watercourses
Minaga Creek KP 389.00
Observation 3 - Reactivation Dig Sites
Date & time of visit: 2022-09-22 08:00
Traditional Land Use Site -Dig Site 43B/44 Fraser River KP 428.000 to KP 427.843
Observation 4 - GAPS Connection Project
Date & time of visit: 2022-09-22 13:00
Trans Mountain is installing a fiber optic leak detection system to enhance the integrity monitoring systems and help identify hazards and potential leaks of product from the pipeline. The Project is generally located in Japer National Park between KP 326 to KP 406 and Mount Robson Provincial Park between KP406 and KP 468. The plastic conduit installed is approximately 1.5 by 1 inch and is installed using a tracked rear vibratory plow unit that trenches and installs the cable at the same time. This method has minimal impact and does not require topsoil salvage. A small excavator travels behind the plow to smooth out the surface. Environmental documentation including the GAPS Connection Project Environmental Protection Plan (EPP) was onsite with the foreman and they appeared familiar with the site specific mitigation measures and locations. Trans Mountain representatives stated:
Observation 5 - Slope Stabilization KP 424.85
Date & time of visit: 2022-09-22 15:00
The inspection team observed reclamation completed at a steep slope along the TMX Anchor Loop RoW at KP 424.85. Trans Mountain representatives stated:
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program