Compliance Verification Activity Report: CV2223-133 - Trans Mountain Pipeline ULC

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2223-133
Start date: 2022-09-20
End date: 2022-09-23

Team:

Regulated company: Trans Mountain Pipeline ULC

Operating company: Trans Mountain Pipeline ULC

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

An environmental inspection was conducted to assess reclamation work of the O&M reactivation section in Jasper National Park and Mount Robson Provincial Park. Focus was on measures at the major watercourse crossing replacements as well as nearby dig sites. Also assessed work on the installation of the fibre optics line through the park.

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Regulatory instrument number(s):

Observations (no outstanding follow-up required)

Observation 1 - General Observations

Date & time of visit: 2022-09-21 08:00

Discipline: Environmental Protection

Categories:

Facility:

Observations:

Trans Mountain representatives stated:

Compliance tool used: No compliance tool used

Observation 2 - Watercourses

Date & time of visit: 2022-09-21 08:00

Discipline: Environmental Protection

Categories:

Facility:

Observations:

Minaga Creek KP 389.00


Rockingham Creek KP 411.57 Fraser River 2 KP 423.83 Ghita Creek KP 420.30 Snaring River KP 360.11

Compliance tool used: No compliance tool used

Observation 3 - Reactivation Dig Sites

Date & time of visit: 2022-09-22 08:00

Discipline: Environmental Protection

Categories:

Facility:

Observations:

Traditional Land Use Site -Dig Site 43B/44 Fraser River KP 428.000 to KP 427.843


Dig Site 9-A KP 334.491

Compliance tool used: No compliance tool used

Observation 4 - GAPS Connection Project

Date & time of visit: 2022-09-22 13:00

Discipline: Environmental Protection

Categories:

Facility:

Observations:

Trans Mountain is installing a fiber optic leak detection system to enhance the integrity monitoring systems and help identify hazards and potential leaks of product from the pipeline. The Project is generally located in Japer National Park between KP 326 to KP 406 and Mount Robson Provincial Park between KP406 and KP 468. The plastic conduit installed is approximately 1.5 by 1 inch and is installed using a tracked rear vibratory plow unit that trenches and installs the cable at the same time. This method has minimal impact and does not require topsoil salvage. A small excavator travels behind the plow to smooth out the surface. Environmental documentation including the GAPS Connection Project Environmental Protection Plan (EPP) was onsite with the foreman and they appeared familiar with the site specific mitigation measures and locations.
Trans Mountain representatives stated:

Compliance tool used: No compliance tool used

Observation 5 - Slope Stabilization KP 424.85

Date & time of visit: 2022-09-22 15:00

Discipline: Environmental Protection

Categories:

Facility:

Observations:

The inspection team observed reclamation completed at a steep slope along the TMX Anchor Loop RoW at KP 424.85. Trans Mountain representatives stated:

Compliance tool used: No compliance tool used

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program