Compliance verification activity type: Field Inspection
Team:
Regulated company: Montreal Pipe Line Limited
Operating company: Montreal Pipe Line Limited
Province(s) / Territory(s):
Discipline(s):
Related events:
Rationale and scope:
[Verify compliance to the OPR and DPR with focus on third party oversight procedures]
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Observation 1 - Information caviardée conformément au paragraphe 144(5) du Code canadien du travail
This information has been redacted pursuant to Section 144(5) of the Canada Labour Code
Observation 2 - Documentation Review and Process Discussion.
Date & time of visit: 2021-09-20 15:00
Discipline: Damage Prevention
Categories:
Facility:
Observations:
Documentation Review and Process Discussion.
Compliance tool used: No compliance tool used
Observation 3 - Aerial Patrol Documentation Provided was Exception-Based.
Date & time of visit: 2021-09-20 15:30
Compliance tool used: Notice of Non-compliance (NNC)
Regulatory requirement:
Relevant section(s):
Company action required:
Due date: 2022-01-31
Date closed: 2022-02-04 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Reason closed: Requirement met
Compliance achieved: Yes
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program