Compliance Verification Activity Report: CV2122-182 - NOVA Gas Transmission Ltd.

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2122-182
Start date: 2021-08-23
End date: 2021-08-27

Team:

Regulated company: NOVA Gas Transmission Ltd.

Operating company: TransCanada PipeLines Limited

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

NGTL 2021 - Elmworth Section: The Elmworth Section consists of approximately 47 km of 1,219 mm (NPS 48) outside diameter (OD) pipeline, a mainline block valve and associated crossover assemblies. The Elmworth Section begins at NW 24-68-07 W6M and ends at SE 12-71-10 W6M, and: NGTL 2021 - Valhalla Section: The Valhalla section consists of approximately 36km of 1,219 mm (NPS 48) outside diameter (OD) pipeline. The Valhalla section begins at SW 17-72-09 W6M and ends at NE 29-75-09 W6M. Assess field implementation of construction safety manual and project specific safety plans for ongoing construction activities; worker tasks including identification of hazards and appropriate controls relevant to the job tasks via hazard assessments; company implementation COVID-19 safety protocols; company oversight of contractors - training & competence, monitoring, supervision and accountability; assess execution of work per applicable procedures and documented work practices.

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Observations (no outstanding follow-up required)

Observation 1 - General Observations - Day 1

Date & time of visit: 2021-08-24 10:00

Discipline: Safety Management

Categories:

Facility:

Observations:

General Observations - HDD Site 1

Compliance tool used: No compliance tool used

Observation 2 - General Observations - Day 2

Date & time of visit: 2021-08-25 10:00

Discipline: Safety Management

Categories:

Facility:

Observations:

General Observations - Day 2

Pipeline Coating - Road 31 West

Poorboy Welding - Road 38

Compliance tool used: No compliance tool used

Observation 3 - General Observations - Day 3

Date & time of visit: 2021-08-26 10:00

Discipline: Safety Management

Categories:

Facility:

Observations:

General Observations - Day 3 

Wapitit HDD, North side 

Lowering Pipe and Tie-In Weld - Road 19+1Elmworth/Valhalla Construction Yard (55.113, -118.802)

Compliance tool used: No compliance tool used

Observation 4 - General Observations - Covid-19 Prevention and Protection

Discipline: Safety Management

Categories:

Facility:

Observations:

General Observations - Covid-19 Prevention and Protection

Compliance tool used: Information Request (IR)

Regulatory requirement:

Relevant section(s):

Company action required:

​Reference our September 10, 2021 virtual meeting with you:

  1. Provide a description of each proactive measure TC Energy implemented to know if Covid-19 infection is present in employees,  contract workers, or other persons in the NGTL Expansion project workplaces.
  2. Explain how these measures have been communicated across the project workplaces, with a view to understanding the consistent effectiveness of their application.

Due date: 2021-09-21

Date closed: 2021-09-23
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 5 - CNC 1 - Faulty Fire Extinguisher

Date & time of visit: 2021-08-24 11:00

Discipline: Safety Management

Categories:

Facility:

Observations:

CNC - 1 Expired Fire Extinguisher

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Remove faulty extinguisher from service and replace with valid one.

Due date: 2021-08-24

Date closed: 2021-08-24
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 6 - CNC 2 - Damaged nylon sling

Date & time of visit: 2021-08-26 11:00

Discipline: Safety Management

Categories:

Facility:

Observations:

At the north side Wapitit HDD site, a nylon sling available for lifting and hoisting use, was observed to have visible damage that would not pass the required pre-use inspection. Upon observation the sling was taken out of service.

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Remove damaged sling from service.

Due date: 2021-08-26

Date closed: 2021-08-26
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 7 - CNC 3 - Control Zone

Date & time of visit: 2021-08-24 11:15

Discipline: Safety Management

Categories:

Facility:

Observations:

South Wapiti River Edge eroding around proximity where workers gain access to river.

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Company shall erect a control zone to caution workers of eroded river bank.

Due date: 2021-08-24

Date closed: 2021-08-25
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 8 - CNC 4 - Hazard Assessment

Date & time of visit: 2021-08-24 10:45

Discipline: Safety Management

Categories:

Facility:

Observations:

CER Inspection Officers observed that Field Level Risk Assessment (FLRA) was not completed in its entirety.

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Company shall complete Field Level Risk Assessment in its entirety.

Due date: 2021-08-24

Date closed: 2021-08-24
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 9 - NNC 1 - Permits for Electrical Grounding

Date & time of visit: 2021-08-26 15:50

Discipline: Safety Management

Categories:

Facility:

Observations:

CER Inspection Officers (IOs) observed that generator skid ground rod was not grounded to earth. The ground rod was in a holder bracket on top of the skid. CER IOs asked for the Electrical Permit for the grounding, and company representative was not able to provide to IOs while on site. TC Energy provided a electrical permit for the Power for Pipeline yard shacks and temporary stand-by generator on September 2nd, 2021 identifying that that Permit # PREL20211139 was issued by the County of Grande Prairie on August 30,2021 to commence. As this electrical connectivity work was visibly connected to the building power source and the stand-by generator electrical panel, the CER Inspector requested TC Energy to provide confirmation to the CER that all electrical work, which includes grounding was performed by a licensed electrician and that work meets or exceeds the Canadian Electrical Code.

Compliance tool used: Notice of Non-compliance (NNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Company shall submit to Canada Energy Regulator a copy of the Electrical Permit that the authorizing County of Grande Prairie No. 1 approved for the electrical installation tie in to the temporary generator stand. Also, provide confirmation documentation to the CER that work  performed under the permit was completed by a certified electrician to Canadian Electrical  Code - CSA Standards. Company shall complete grounding of temporary stand-by generator conforming to Safety Codes Act of Alberta, all applicable Codes, and Municipal Bylaws. Company to provide photos illustrating proper grounding of the stand-by generator.

Due date: 2021-09-13

Date closed: 2021-10-12
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

There are no observations with outstanding follow-up

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program

Observation 10 - Information caviardée conformément au paragraphe 144(5) du Code canadien du travail

This information has been redacted pursuant to Section 144(5) of the Canada Labour Code