Compliance verification activity type: Field Inspection
Team:
Regulated company: Foothills Pipe Lines (South B.C.) Ltd.
Operating company: Foothills Pipe Lines (South B.C.) Ltd.
Province(s) / Territory(s):
Discipline(s):
Rationale and scope:
Foothills Pipe lines (South BC) Ltd. - Zone 8 West Path Delivery 2022 Project: 32 km of NPS 48 steel pipe, ILL launcher and receiver facilities: Assess field implementation of construction safety manual and project specific safety plans for ongoing construction activities; worker tasks including identification of hazards and appropriate controls relevant to the job tasks via hazard assessments; company implementation of infection prevention protocols; company oversight of contractors - training & competence, monitoring, supervision and accountability; assess execution of work per applicable procedures and documented work practices.
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Observation 1 - General Observation
Date & time of visit: 2022-07-19 16:15
Discipline: Safety Management
Categories:
Facility:
Observations:
Compliance tool used: No compliance tool used
Observation 2 - Information caviardée conformément au paragraphe 144(5) du Code canadien du travail
This information has been redacted pursuant to Section 144(5) of the Canada Labour Code
Observation 3 - CNC 1 Fire Extinguisher
Date & time of visit: 2022-07-19 14:00
CER Inspectors observed 20 lb, Type ABC Fire Extinguisher mounted on light generator trailer unit LT1007, that had a defective nozzle hose.
Compliance tool used: Corrected Non-compliance (CNC)
Regulatory requirement:
Relevant section(s):
Company action required:
Company shall replace damaged nozzle hose on ABC type fire extinguisher mounted on light generator. Company shall replace nozzle hose on 20 lb ABC Fire Extinguisher that is attached to light generator trailer or replace with new Fire Extinguisher of the same size/type, that has valid inspection tags attached.
Due date: 2022-07-19
Date closed: 2022-07-20 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Reason closed: Requirement met
Compliance achieved: Yes
Observation 4 - CNC 2 Antennae Grounding
Date & time of visit: 2022-07-19 13:30
CER Inspectors observed a portable steel trailer with antennae and ladder vertically attached that was not bonded or grounded to an earth ground.
Company shall bond portable steel trailer with antennae and ladder vertically attached to an earth ground.
Observation 5 - CNC 3 Grounding of Switchgear
Date & time of visit: 2022-07-19 13:40
CER Inspectors observed portable electrical generator running that was connected to switching breaker panels that was not earth grounded or bonded to the portable electrical generator that was bonded to an earth grounded.
Company shall bond each 120/208 volt switch gear cabinets to an earth ground or bond the two swich gear cabinets to the portable generators earth ground.
Observation 6 - CNC 4 Control Zone
Date & time of visit: 2022-07-19 15:00
CER Inspectors observed a steep slope (leading edge) directly southeast of Warehouse which did not have a control zone to prevent workers from accessing the lower SMJV parking area.
Company is to place a caution control zone that identifies the hazard and prevents workers from accessing the slopped terrain.
Observation 7 - CNC 5 Loading Warehouse Dock
Date & time of visit: 2022-07-19 15:20
CER Inspectors observed Construction Yard warehouse dock without barrier protection chain fence secured to end posts while dock was not in use.
Company shall attach chain barrier at each control barrier post at loading dock entry/exit points when dock is not in use.
Date closed: 2022-07-19 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program