Compliance Verification Activity Report: CV2223-022 - Enbridge Pipelines Inc.

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2223-022
Start date: 2022-08-09
End date: 2022-08-10

Team:

Regulated company: Enbridge Pipelines Inc.

Operating company: Enbridge Pipelines Inc.

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

Process Safety - Regina Terminal. Assessing implementation of identification, analysis and control of process hazards including established process hazard inventory. Assessing completion of preventive maintenance (inspection and testing) activities on critical safety equipment including tank/sump level sensors and pressure relieving devices per prescribed frequencies under CSA Z662 and company programs.

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Observations (no outstanding follow-up required)

Observation 1 - General Observations - Process Safety Management

Date & time of visit: 2022-08-09 08:00

Discipline: Safety Management

Categories:

Facility:

Observations:

General Observations - Process Safety Management 

Process Hazard Analysis  Management of Change (MOC)  Safety Critical Equipment  Electrical Safety - ARC Flash Safety Program and Oil Storage Tank Bonding and Grounding Fire Prevention and Protection 

Compliance tool used: No compliance tool used

Observation 2 - NNC - 1 - Failure to complete an Information Request

Date & time of visit: 2022-08-25 08:00

Discipline: Safety Management

Categories:

Facility:

Observations:

NNC - 1 - Failure to complete an Information Request in the required time frame.

  1. On August 15, 2022, the CER Inspection Officer requested through Information Request (IR), a copy of the Enbridge, Regina area LP Risk Register. The requested due date for the IR was originally stated as August 17, 2022, and at the request of Enbridge Senior Compliance Advisor, the due date was extended to August 24, 2022. As of August 24, 2022, the requested document was still not submitted, and without justification or prior conversation to inform the CER IO there would be delays etc.
    1. The CER IO requires the requested document to assess for a demonstration of hazard identification processes, as related to inspection activities pursuant to CVA 2223-022. 
    2. The CER IO views the requested risk register document, as what should be a readily available document for applicable stakeholders, such as a CER Inspection Officer. The delay in providing the requested document, in its entirety, is not acceptable. 

Compliance tool used: Notice of Non-compliance (NNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Enbridge is to file to the requested document, in its entirety, by end of day, August 31, 2022. 

Due date: 2022-08-31

Date closed: 2022-08-31
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program