Compliance verification activity type: Field Inspection
Team:
Regulated company: Trans Mountain Pipeline ULC
Operating company: Kinder Morgan Canada Inc
Province(s) / Territory(s):
Discipline(s):
Related events:
Rationale and scope:
Environmental inspection of ongoing construction on Spread 6 of the Trans Mountain Expansion Project. The scope was focused on watercourse crossings, implementation of erosion and sediment control measures, dewatering requirements, Sites of Indigenous Significance (SIS) and reclamation.
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Regulatory instrument number(s):
Observation 1 - General Observations
Date & time of visit: 2023-08-29 08:00
Discipline: Environmental Protection
Categories:
Facility:
Observations:
Bridal Veil Falls Provincial Park (KP 1076+550)
Compliance tool used: No compliance tool used
Observation 2 - Watercourses
BC-715 Chilliwack Creek Area
Observation 3 - Corrected Non-Compliance - Level 2 Cleaning Station
Date & time of visit: 2023-08-30 09:30
Compliance tool used: Corrected Non-compliance (CNC)
Regulatory requirement:
Relevant section(s):
Company action required:
IOs received confirmation during the inspection that the contractor installed 'no entry' and 'topsoil, level 2 cleaning required' signage on both sides of Stewart Slough crossing to prevent workers from crossing it without proper cleaning.
Due date: 2023-08-30
Date closed: 2023-09-21 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Reason closed: Requirement met
Compliance achieved: Yes
Observation 4 - Notice of Non-Compliance - Wingwalls and Sediment Fence down at Coligny Creek
Date & time of visit: 2023-08-29 10:00
During the inspection of Coligny Creek (BC-736 KP1129) the CER inspection team identified wingwalls not attached to the bridge and fallen sediment fence at the watercourse. IOs requested addition sediment fence be installed at the top of the slope to prevent erosion in case of a rain event. Trans Mountain provide photographic evidence of completed wing wall and ESC repair at this location.
Compliance tool used: Notice of Non-compliance (NNC)
Photographic evidence provided. No further actions required.
Due date: 2023-09-20
Date closed: 2023-09-20 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program