Compliance verification activity type: Field Inspection

Activity #: CV2324-117
Start date: 2023-08-29
End date: 2023-08-31

Team:

Regulated company: Trans Mountain Pipeline ULC

Operating company: Kinder Morgan Canada Inc

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

Environmental inspection of ongoing construction on Spread 6 of the Trans Mountain Expansion Project. The scope was focused on watercourse crossings, implementation of erosion and sediment control measures, dewatering requirements, Sites of Indigenous Significance (SIS) and reclamation.

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Regulatory instrument number(s):

Observations (no outstanding follow-up required)

Observation 1 - General Observations

Date & time of visit: 2023-08-29 08:00

Discipline: Environmental Protection

Categories:

Facility:

Observations:

Bridal Veil Falls Provincial Park (KP 1076+550)

Cranberry Fields (KP 1084+550) Lightening Rock (KP 1112.429 – 1112.557) SF-14 (KP 1112.90 – 1113.70) Burgess Ave Laydown (KP 1130.1)

Compliance tool used: No compliance tool used

Observation 2 - Watercourses

Date & time of visit: 2023-08-29 08:00

Discipline: Environmental Protection

Categories:

Facility:

Observations:

BC-715 Chilliwack Creek Area

BC-722 Stewart Slough BC-726 c) and e) Unnamed Drainages BC-729 Unnamed Channel BC-736 Coligny Creek BC 747 Nathan Creek BC-747 a), b) and c) Unnamed Channels BC-750 Unnamed Channel

Compliance tool used: No compliance tool used

Observation 3 - Corrected Non-Compliance - Level 2 Cleaning Station

Date & time of visit: 2023-08-30 09:30

Discipline: Environmental Protection

Categories:

Facility:

Observations:

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

IOs received confirmation during the inspection that the contractor installed 'no entry' and 'topsoil, level 2 cleaning required' signage on both sides of Stewart Slough crossing to prevent workers from crossing it without proper cleaning.

Due date: 2023-08-30

Date closed: 2023-09-21
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 4 - Notice of Non-Compliance - Wingwalls and Sediment Fence down at Coligny Creek

Date & time of visit: 2023-08-29 10:00

Discipline: Environmental Protection

Categories:

Facility:

Observations:

During the inspection of Coligny Creek (BC-736 KP1129) the CER inspection team identified wingwalls not attached to the bridge and fallen sediment fence at the watercourse. IOs requested addition sediment fence be installed at the top of the slope to prevent erosion in case of a rain event. Trans Mountain provide photographic evidence of completed wing wall and ESC repair at this location. 

Compliance tool used: Notice of Non-compliance (NNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Photographic evidence provided. No further actions required.

Due date: 2023-09-20

Date closed: 2023-09-20
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program