Compliance Verification Activity Report: CV2324-093 - Trans Mountain Pipeline ULC

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2324-093
Start date: 2023-07-17
End date: 2023-07-21

Team:

Regulated company: Trans Mountain Pipeline ULC

Operating company:

Province(s) / Territory(s):

Discipline(s):

Rationale and scope:

[TMX Spread 5A and 5B - Assess field implementation of construction safety manual and project specific safety plans for ongoing construction activities; worker tasks including identification of hazards and appropriate controls relevant to the job tasks via hazard assessments; company oversight of contractors - training & competence, monitoring, supervision and accountability; assess execution of work per applicable procedures and documented work practices.]

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Observations (no outstanding follow-up required)

Observation 1 - Spread 5B Miners Tunnel

Date & time of visit: 2023-07-18 10:00

Discipline: Safety Management

Categories:

Facility:

Observations:

Spread 5B: Location 1029

Compliance tool used: No compliance tool used

Observation 2 - Spread 5A Jacko Lake

Date & time of visit: 2023-07-19 09:00

Discipline: Safety Management

Categories:

Facility:

Observations:

Pad 1:    

Compliance tool used: No compliance tool used

Observation 3 - Cartwright

Date & time of visit: 2023-07-20 09:00

Discipline: Safety Management

Categories:

Facility:

Observations:

Cartwright location top KP 844.114 the bottom KP843.68 grade is between 16 to 20%

Compliance tool used: No compliance tool used

Observation 4 - CNC-Eye Wash Medic truck

Date & time of visit: 2023-07-20 12:00

Discipline: Safety Management

Categories:

Facility:

Observations:

 Medic truck at this location had zero bottles of eye wash or saline for use in the event of an injury.

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Company created a PAR to ensure that all medic srucks on the spread were inspected and had appropriate supplies on board. 

Due date: 2023-07-20

Date closed: 2023-10-27
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program