Compliance Verification Activity Report: CV2021-158 - Plains Midstream Canada ULC

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2021-158
Start date: 2021-02-01
End date: 2021-02-05

Team:

Regulated company: Plains Midstream Canada ULC

Operating company: Plains Midstream Canada ULC

Province(s) / Territory(s):

Discipline(s):

Rationale and scope:

[Inspection to verify the implementation of CAPAs from incident in ON region follow up regarding third party oversight]

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Observations (no outstanding follow-up required)

Observation 1 - Third Party Crossing Elmdale Ave LaSalle Ontario

Date & time of visit: 2021-03-16 09:30

Discipline: Damage Prevention

Categories:

Facility:

Observations:

CER inspectors visited the site of a third party hydrovac activity in preparation for the installation of a fibre optic line installation via horizontal directional drill(HDD) in the prescribed area within 1m of 3 of the Plains pipelines.

Compliance tool used: No compliance tool used

Observation 2 - General

Date & time of visit: 2021-03-16 11:00

Discipline: Damage Prevention

Categories:

Facility:

Observations:

During the damage prevention field inspection the following were noted:

Compliance tool used: No compliance tool used

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program