Compliance Verification Activity Report: CV2122-185 - NOVA Gas Transmission Ltd.

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2122-185
Start date: 2021-09-22
End date: 2021-09-23

Team:

Regulated company: NOVA Gas Transmission Ltd.

Operating company: TransCanada PipeLines Limited

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

NGTL 2021 - Karr Section: The Karr Section consists of approximately 57 km of NPS 48 pipeline, mainline block valves, associated crossover assemblies and launcher/receiver assemblies. The Karr Section begins at NW 28-63-01 W6M and ends at NE 26-67-05 W6M. Assess field implementation of construction safety manual and project specific safety plans for ongoing construction activities; worker tasks including identification of hazards and appropriate controls relevant to the job tasks via hazard assessments; company implementation COVID-19 safety protocols; company oversight of contractors - training & competence, monitoring, supervision and accountability; assess execution of work per applicable procedures and documented work practices.

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Observations (no outstanding follow-up required)

Observation 1 - IM Observations

Date & time of visit: 2021-09-22 09:00

Discipline: Indigenous Monitoring

Categories:

Facility:

Observations:

The following section contains independent observations made by an Indigenous Monitor who accompanied the Canadian Energy Regulator Inspection Team during this inspection, as part of the CER’s commitment to the NGTL's Indigenous Monitoring Program. They are reproduced and publicized within my report for greater transparency. They are not my conclusions but represent one source of information among others I have considered throughout the inspection along with my own direct observations and information received from the company.

IMAC – Sucker Creek First Nation - SCFN Services – IM:
Safety Inspection - September 21-24,  2021 CV2122-185 Grande Prairie area accompanied with CER and NGTL/Midwest Environmental Team

  1. September 22, 2021: Karr Yard with the CER, NGTL/Midwest Environmental Team and Emerinskin IM, for site Orientation and discuss the day activities
  2. September 23, 2021: Midwest Elmworth Yard with the CER, NGTL/Midwest Environmental Team and Emerinskin IM, for site Orientation and discuss the day activities
IMAC – Ermineskin Cree Nation – IM:
Canadian Energy Regulator 
IAMC-NGTL
September 22-23-2021
Safety Inspection
Karr (RoW) Elmorth section 
 
September 22-23-2021
Met crew to get rapid testing done (CER-IAMC)
talk about looking at active work activities, step slopes, safety of the workers, introductions between the (CER-IAMC) IOs, IMs, Tc energy representatives workers were all wearing masks and practicing physical distancing.
CER staff and monitors were asked to show a completed Tc energy -COVID 19 self-declaration screening form by the Tc energy -COVID-19 Response Plan 
Temperature screenings stations were in place in facilities great practice measures to stop the spread of COVID-19, rapid testing also available for all workers whenever they want to get tested, went over visit site orientation 

Stop 1# KP 1+092   Stop 2# Kp 0+000 kick off  Stop 3# Kp 0+744Arriving back at karr yard for debrief surerus Murphy bought (two) training simulators for younger and new employees that are new or switching machinery, to train and to get the full experience of the machine. Before heading out to work on the project. Before they do they have to go through simulator and a bit of work in the yard before heading to the project. I think it’s a great safety measure and making sure they are competent in there workers. 

Compliance tool used: No compliance tool used

Observation 2 - General

Discipline: Safety Management

Categories:

Facility:

Observations:

General

KP 1+093KP 0+744KP 0+00 – Compressor Station Smoky West Steep Slope:

Compliance tool used: Information Request (IR)

Regulatory requirement:

Relevant section(s):

Company action required:

KARR – SMJV:
Please provide the following:
 

  1. Provide copies of any safety audits completed on the project by NGTL or their contractor. If no NGTL audits were conducted please provide the rationale. “The audit/formal inspection must be conducted when a representative sample of the personnel and Work activities can be observed.”
  2. Please provide the variance issued to SMJV regarding their requirement to conduct and HSE audit of the Karr Spread –The CER were told that the required HSE Audit did not occur due to COVID.
  3. For Karr - Completed inspection forms from NGTL and contractor H&S management - last 3 Wednesdays( Sep 1,8,15 2021)
  4. Copies of craft inspector dailies (3 most recently completed for each person):
    • Karr:
      • Inspector X,
      • Inspector X, and
      • the inspector for the steep slope visited  - one inspection report for each of the following stages clearing grading, stringing, and lowering-in
  5. Provide explanation/documentation to identify how requirements of s. 4.2 of TES-CT-SLOPE-GL Slope Work Specification CAN-US-MEX have been achieved.
  6. Confirmation if there have been any updates to the steep slope documents required as per the TES-CT-SLOPE-GL Slope Work Specification CAN-US-MEX (provide the updates if so. If not, provide rationale for not being completed).  For example. Section 4.6.2 of the TES-CT-SLOPE-GL Slope Work Specification (CAN-US-MEX)  states The Hazardous Slope Work Plan shall identify the changes to the site conditions that would effect a change to the Hazardous Slope Work Plan (e.g., tropical rain, ice, snow, lighting storm). And the SMJV Slope Construction Safety & Execution Plan states “SMJV anticipates that the grading works in this area to be well within machine capabilities and will provide a grade design after clearing works have completed which will be updated and included in Appendix C of this document.” Appendix C for SMJV shows the original slope data prior to clearing and does not include grade design.  Appendix C docs are dated 28/10/20 and the report date (showing no revisions) is dated 03/11/20.
  7. Please provide the Machine Stability Risk Assessment for the machines being used by NGTL inspectors on Karr. Section 4.5.2 of the TES-CT-SLOPE-GL Slope Work Specification (CAN-US-MEX)  states “The Hazardous Slope Work Plan shall identify the equipment and machine manufacturers’ recommended safe working limitations.”
  8. Please explain how the TES-CT-SLOPE-GL Slope Work Specification CAN-US-MEX Table 3-2: Wheeled and Tracked Machine Stability Risk Matrix was created.
  9. Please identify the ‘wheeled machines’ used on the slope visited during the Karr inspection and their maximum slope limitations established by the manufacturer.
  10. Please provide a rationale for Post Grade ‘Machine Stability Risk Assessment – Risk Value for Wheeled Vehicles’. The CER observed that there appeared to be no assessments for slope limitations of wheeled vehicles.
  11. Please provide verification that the ‘Micro-crack’ and other items identified in the inspection log book for the CAT 594 Unit # SB137 completed in August prior to the machine being delivered to this project (as reviewed at Karr Road 1 KP1+093) were reviewed and determined to be within acceptable tolerance or corrected prior to use.
  12. Provide the NGTL inspector training and competency evaluation for ATV/UTV use.
  13. Please provide copies of the 3 most recently completed ATV/UTV Competency Evaluations if applicable.
  14. Please provide copies of the 3 most recently completed Supervisor Steep Slopes Competency Evaluation if applicable.
  15. Please provide copies of the 3 most recently completed Steep Slope Worker Competency Evaluation if applicable.

Due date: 2021-10-21

Date closed: 2021-11-05
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 3 - CNC#1: Lack of adequate controls while working in proximity to open excavation

Date & time of visit: 2021-09-22 09:00

Discipline: Safety Management

Categories:

Facility:

Observations:

A worker was observed at KP 0.00 standing within 0.5m of an open excavation (greater than 2.5m in depth) without any means of protective measures in place to prevent falling into the excavation.  The individual was working as a spotter for a second worker who was working within the excavation with a high pressure water wand from a VacTruck.  According to company and contractor site personnel, the worker had previously worn a fall arrest harness while performing similar tasks but was not doing so at the time of the inspection.  Once noted, the company took action to ensure the worker donned a fall arrest harness at the time of the inspection.

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

The issue was resolved to the satisfaction of the Inspection Officers at the time of the inspection.  No further action is required.

Due date: 2021-09-22

Date closed: 2021-09-22
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or