Compliance verification activity type: Field Inspection
Team:
Regulated company: Enbridge Pipelines Inc.
Operating company: Enbridge Pipelines Inc.
Province(s) / Territory(s):
Discipline(s):
Related events:
Rationale and scope:
Environmental post-construction inspection of Enbridge Pipelines Inc.'s (Enbridge) Line 3 Pipeline Replacement Project, Spreads 6 to 9. This inspection was conducted in conjunction with monitors from the Indigenous Advisory Monitoring Committee (IAMC). The scope of the inspection included, but was not limited to, the following: traditional land & resource use and heritage resource sites, watercourse crossings, reclamation, erosion and sediment control, waste management, soil handling, and biosecurity.
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Regulatory instrument number(s):
Observation 1 - General Observations
Date & time of visit: 2020-09-29 17:00
Discipline: Environmental Protection
Categories:
Facility:
Observations:
Compliance tool used: No compliance tool used
Observation 2 - Wetlands
Date & time of visit: 2020-10-01 17:00
KP 768+200
Observation 3 - Watercourses
Little Pipestone Creek KP 751+770
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program