Field inspection of the NGTL North Montney Construction Project: Aitken Creek and Kahta Sections reclamation. Construction of the Project was initiated in August 2018, with final clean-up finishing in April 2021. Post-construction monitoring was initiated in 2021 in the first full growing season following final clean-up. The North Montney Mainline, Aitken Creek Section and Kahta Section includes approximately 206 kilometres (km) of 1,067 millimetre (mm) outside diameter (OD) (NPS 42 inch) pipeline. Tree planting occurred in summer 2021 and seed collection in fall 2021. Native shrub planting was completed in 2022 and the first year PCMR was filed Jan 2022. The focus of the inspection included: vegetation growth, surface water drainage, erosion, access control, line of sight effectiveness, and watercourse reclamation.<br />
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Regulatory instrument number(s):
Observation 1 - General Observations
Date & time of visit: 2022-09-01 08:00
Discipline: Environmental Protection
Categories:
Facility:
Observations:
Aitken Creek and Kahta Sections
Compliance tool used: No compliance tool used
Observation 2 - Watercourses and Wetlands
The following watercourse crossings were visited during the inspection: -Moberly River KP 31+300 -Tributary to Mackie Creek KP 84+400 -Groundbirch Creek KP 104+550 -Tributary to Groundbirch Creek KP 104+250 - Tributary to Groundbirch Creek KP 105+616 -Kobes Creek KP 111+800 -Cameron River KP 133+100 -Townsend Creek KP 149+854 -Blueberry River KP 174+242 -Tributary to Blueberry River KP 173+850
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program