Compliance Verification Activity Report: CV2223-041 - Enbridge Southern Lights GP Inc. on behalf of Enbridge Southern Lights LP

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2223-041
Start date: 2022-05-17
End date: 2022-05-18

Team:

Regulated company: Enbridge Southern Lights GP Inc. on behalf of Enbridge Southern Lights LP

Operating company: Enbridge Southern Lights LP

Province(s) / Territory(s):

Discipline(s):

Rationale and scope:

[Field inspection of O&M activities] - Hazardous Energy Management and LOTO practices

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Information Request

IR from CER (Information Request sent from CER to company)
IR1 - Pre-Inspection Documentation

Legislative Requirement : Canadian Energy Regulator Act (CERA)

Theme and Categories

Safety Management
  • Workplace Practices
    • Procedures/Work Instructions

Due Date : 2022-05-09

Review Response
Acceptable

Follow-up Action
None

Observations (no outstanding follow-up required)

Observation 1 - Site Specific Procedure and Supporting Documentation

Date & time of visit: 2022-05-17 13:00

Discipline: Safety Management

Categories:

Facility:

Observations:

The Enbridge PLM supervisor led an overview of the site specific procedure for pig launching including lock out tag out requirements for the operation.

Planning

Execution

Compliance tool used: No compliance tool used

Observation 2 - Simulation - LOTO and Line 13 Pig Launch Pre-planning Meeting

Date & time of visit: 2022-05-18 09:00

Discipline: Safety Management

Categories:

Facility:

Observations:

Attended a simulated pre-work planning meeting for a cleaning tool launch on line 13. The meeting included a review of the pertinent documents including:

Compliance tool used: No compliance tool used

Observation 3 - Simulation - LOTO and Line 13 Pig Launch Execution

Date & time of visit: 2022-05-19 11:00

Discipline: Safety Management

Categories:

Facility:

Observations:

Isolation and Lock-out
Workers walked through the process to Launch a cleaning tool on Line 13 including the de-energization, isolation and application of locks and tags on valves and electrical switches. An explanation of the verification step for double block and bleed (DIB) was received including the applicable scenario where DIB was not achieved and the engineer certified Alternate isolation Plan was followed.

Vac truck operations were explained including the grounding method and requirement for H2S/Benzene indicators and signage.

Loading Tool
Workers described the requirement for gas/benzene detection, proper PPE, fire extinguishers and bonding cables and confirmation that all ignition sources are monitored at least 100 feet away from work area (vehicles, air compressor). Personnel to wear full face mask respirators when working near open trap door and front of the trap is flagged or signage installed to prevent workers from inadvertently walking or working within 15 m (50 ft) of trap.

Tool is loaded with non-critical lift, however load charts are verified and rigging is inspected. Tool is loaded into trap with care taken to avoid damage to the o-ring which is cleaned and inspected prior to closing the trap door.

Flooding and Pressurizing
Drawings are verified for all steps including valve operation. The trap is flooded from the vac truck and valve breakers are energized. LOTO for drain and vent valves is verified to be in closed position. Valve is opened to flood and pressurize trap and the door seal and fittings are verified for no leaks. Tools is launched as per procedure CCO confirms acceptable conditions and control center is notified of time of launch.

Compliance tool used: No compliance tool used

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program