Compliance Verification Activity Report: CV2223-126 - Trans Mountain Pipeline ULC

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2223-126
Start date: 2022-07-19
End date: 2022-07-21

Team:

Regulated company: Trans Mountain Pipeline ULC

Operating company:

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

TMX Spread 5A - Assess field implementation of the environmental protection plan and associated resource specific plans for ongoing construction activities; verify mitigation measures at watercourse crossings, adequate erosion and sediment control measures, mitigation for sites of Indigenous significance, and mitigation for bird nesting.

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Regulatory instrument number(s):

Observations (no outstanding follow-up required)

Observation 1 - General Right-of-Way (RoW)

Date & time of visit: 2022-07-19 12:30

Discipline: Environmental Protection

Categories:

Facility:

Observations:

Note: all KPs and AKs are approximate.

General


KP 973.20
AK 3.6
AK 2.04 to 2.4
AK 3.9
KP 973+200
AK 3.6
AK 2.02 to 2.4 AK 3.9

Compliance tool used: No compliance tool used

Observation 2 - Watercourse Crossings

Date & time of visit: 2022-07-19 11:30

Discipline: Environmental Protection

Categories:

Facility:

Observations:

Note: all KPs are approximate.

KP 924.15


KP 914+600 to 918
KP 912+630
KP 986+125 to 987+100
KP 975
KP 851.580
KP 861+470

Compliance tool used: No compliance tool used

Observation 3 - Corrected Non-Compliance (CNC)

Date & time of visit: 2022-07-19 13:30

Discipline: Environmental Protection

Categories:

Facility:

Observations:

At KP 915 (approximate) - Shuta Creek, bird nests were previously located in the area. Some mitigation was installed including a buffer with rope, posts, and flagging, however bird nest buffer signage was missing.

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

TMEP will install bird nesting area signage as required by its Environmental Field Guide.

Due date: 2022-07-21

Date closed: 2022-07-26
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program