Compliance Verification Activity Report: CV2122-151 - Trans Québec and Maritimes Pipeline Inc.

Overview

Compliance verification activity type: Field Inspection

Activity #: CV2122-151
Start date: 2021-09-08
End date: 2021-09-08

Team:

Regulated company: Trans Québec and Maritimes Pipeline Inc.

Operating company: TransCanada PipeLines Limited

Province(s) / Territory(s):

Discipline(s):

Rationale and scope:

Field inspection to verify compliance to the requirements contained within the Onshore Pipeline Regulations (OPR) and the CER Damage Prevention Regulations - Obligations of Pipeline Companies (DPR-Obligations) with a focus on third party oversight procedures. Field inspection to include document review and site inspection of active third party crossing activity.

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Observations (no outstanding follow-up required)

Observation 1 - Damage Prevention Program Post-Inspection IR

Discipline: Damage Prevention

Categories:

Facility:

Observations:

As part of the scope of this field inspection which includes document review, the CER IOs require information pertaining to the TQM Damage Prevention Program as required pursuant to section 47.2 of the OPR. 
 

Compliance tool used: Information Request (IR)

Regulatory requirement:

Relevant section(s):

Company action required:

Due date: 2021-09-16

Date closed: 2021-09-20
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 2 - Oversight of third party contractor excavation for watermain facility installation

Date & time of visit: 2021-09-08 08:45

Discipline: Damage Prevention

Categories:

Facility:

Observations:

​Inspections Officers (IOs) arrived to the 3rd party construction site accompanied by TC Energy representatives:

Compliance tool used: No compliance tool used

Observation 3 - Document review and process discussion

Date & time of visit: 2021-09-08 13:00

Discipline: Damage Prevention

Categories:

Facility:

Observations:

Compliance tool used: No compliance tool used

Observation 4 - Line locate for ground disturbance within the prescribed area

Date & time of visit: 2021-09-08 14:00

Discipline: Damage Prevention

Categories:

Facility:

Observations:

Compliance tool used: No compliance tool used

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program