Compliance verification activity type: Field Inspection
Team:
Regulated company: Trans Québec and Maritimes Pipeline Inc.
Operating company: TransCanada PipeLines Limited
Province(s) / Territory(s):
Discipline(s):
Rationale and scope:
Field inspection to verify compliance to the requirements contained within the Onshore Pipeline Regulations (OPR) and the CER Damage Prevention Regulations - Obligations of Pipeline Companies (DPR-Obligations) with a focus on third party oversight procedures. Field inspection to include document review and site inspection of active third party crossing activity.
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Observation 1 - Damage Prevention Program Post-Inspection IR
Discipline: Damage Prevention
Categories:
Facility:
Observations:
As part of the scope of this field inspection which includes document review, the CER IOs require information pertaining to the TQM Damage Prevention Program as required pursuant to section 47.2 of the OPR.
Compliance tool used: Information Request (IR)
Regulatory requirement:
Relevant section(s):
Company action required:
Due date: 2021-09-16
Date closed: 2021-09-20 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Reason closed: Requirement met
Compliance achieved: Yes
Observation 2 - Oversight of third party contractor excavation for watermain facility installation
Date & time of visit: 2021-09-08 08:45
Inspections Officers (IOs) arrived to the 3rd party construction site accompanied by TC Energy representatives:
Compliance tool used: No compliance tool used
Observation 3 - Document review and process discussion
Date & time of visit: 2021-09-08 13:00
Observation 4 - Line locate for ground disturbance within the prescribed area
Date & time of visit: 2021-09-08 14:00
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program